Difficult points stop being difficult when they are presented clearly. The API Refractory Personnel materials at PracticeVCE organize the API-936 exam content so that hard topics become understandable in sequence — structure first, then practice, then confidence.
API API-936 Exam Overview:
| Certification Vendor: | American Petroleum Institute (API) |
|---|---|
| Exam Name: | API 936 Refractory Personnel Certification Examination |
| Exam Number: | API-936 |
| Available Languages: | English |
| Exam Price: | USD 550–USD 1000 (varies by region and membership status) |
| Exam Duration: | 180 minutes |
| Certificate Validity Period: | 3 years |
| Related Certifications: | API 936 Refractory Inspection Certification API 936 Refractory Personnel Certification |
| Exam Format: | Multiple-choice questions, Computer-based testing (CBT) |
| Real Exam Qty: | Approximately 75 multiple-choice questions |
| Passing Score: | 70% (typical passing threshold, subject to API scaling) |
| Recommended Training: | API 936 Certification Training Courses |
| Exam Registration: | API Individual Certification Program (ICP) Registration |
| Sample Questions: | DOWNLOAD DEMO |
| Exam Way: | Computer-based testing (CBT) at authorized test centers or approved remote proctoring locations (if available in region). |
| Pre Condition: | Relevant work experience in refractory installation, inspection, or maintenance is typically required (commonly 1–5 years depending on education background). |
| Official Syllabus URL: | https://www.api.org/products-and-services/individual-certification-programs/icp/936-refractory-personnel-certification-exam |
API API-936 Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Topic 1: Installation Practices | 30% | - Installation methods
|
| Topic 2: Safety and Standards | 20% | - API standards compliance
|
| Topic 3: Inspection and Quality Control | 25% | - Inspection methods
|
| Topic 4: Refractory Materials | 25% | - Types of refractory materials
|
API-936 Exam Details and Study Questions
The API-936 exam contains Approximately 75 multiple-choice questions questions with 180 minutes minutes to complete them. A clear knowledge structure is what makes that volume manageable — you answer faster when every topic has its place.
Passing the API-936 exam requires 70% (typical passing threshold, subject to API scaling), and registration costs USD 550–USD 1000 (varies by region and membership status). Structured preparation is how you spend study time once and exam fees once.
Immediately. The system emails you at once with the download link for the API Refractory Personnel materials — the whole delivery process takes about a minute. Open the email, download the API-936 exam product to your computer, install it, and you are studying within minutes of deciding to. If the message does not appear, check your spam folder; after 2 hours without delivery, contact support. Install on all of your own devices without limit.
Relevant work experience in refractory installation, inspection, or maintenance is typically required (commonly 1–5 years depending on education background).
The API-936 exam is the official assessment behind the API Refractory Personnel certification from API. Lifelong learning has become the norm precisely because industries keep moving — and this credential is a concrete way to keep pace. Many candidates only sit it seriously on a second attempt; structured preparation is how you make the first one count.
API recommends these training resources for candidates:
Official training adds depth; a clearly structured practice bank with verified answers adds direction. Together they cover both sides of preparation.
The official outline divides the API-936 exam into weighted domains, including:
- Safety and Standards (20%)
- Installation Practices (30%)
- Refractory Materials (25%)
The API Refractory Personnel bank at PracticeVCE mirrors this structure, so the knowledge map you build while practicing matches the one the exam uses.
Registration for the API-936 exam runs through these official channels:
It is never too late to start — but starting today beats starting after one more week of hesitation.
Structure is the design principle. The API Refractory Personnel materials first build a clear knowledge structure of the API-936 exam, so difficult points become understandable in sequence rather than intimidating in isolation. Our experts have prioritized the most important knowledge for busy learners, and every answer is expert-verified — so your limited hours go exactly where the objectives point.
API Refractory Personnel Sample Questions:
As-installed gunned test specimens are prepared by cutting specimens with a:
- A. trowel
- B. portable rescue saw
- C. diamond saw
- D. band saw
Correct Answer: C 🗳️
Explanation: Only visible for PracticeVCE members. You can sign-up / login (it's free).
Before application of a curing compound the hydraulic bond castable surface shall not be allowed to air dry longer than:
- A. 1 hour.
- B. 24 hours.
- C. 2 hours.
- D. 8 hours.
Correct Answer: A 🗳️
Explanation: Only visible for PracticeVCE members. You can sign-up / login (it's free).
Which of the following conditions must be met for test results from trial mixes of low cement castables to be accepted for qualification?
- A. The drying process must be conducted at 220°F (104°C) for at least 48 hours before firing.
- B. Bulk density and CCS must exceed average values published in ASTM C401.
- C. The water content must not vary more than ±1.0% from that recommended by the manufacturer.
- D. Specimens must be fired at 1500°F (815°C) and held for a minimum of 3 hours.
Correct Answer: C 🗳️
Explanation: Only visible for PracticeVCE members. You can sign-up / login (it's free).
If the refractory lining is required before pressure testing, all pressure-retaining welds shall:
- A. be lined with coal tar epoxy.
- B. include additional anchors.
- C. be gunned with no needles.
- D. remain unlined and exposed to test medium.
Correct Answer: D 🗳️
Explanation: Only visible for PracticeVCE members. You can sign-up / login (it's free).
Which party or individual is responsible for submitting a dryout procedure for a new lining?
- A. Inspection company
- B. Dry-out company
- C. Contractor
- D. Refractory manufacturer
Correct Answer: C 🗳️
Explanation: Only visible for PracticeVCE members. You can sign-up / login (it's free).
Viewing page 1 out of 18 pages.
Viewing questions 1-5 out of 87 questions.

1136 Customer Reviews
