A formal exam has an atmosphere, and it is trainable. The test engine for the Project-Management exam simulates that environment on your computer, so the real day feels familiar instead of foreign. Pair it with the verified answers in the NCARB ARE 5.0 Project Management (PjM) bank from PracticeVCE, and each mock teaches something.
NCARB Project-Management Exam Overview:
| Certification Vendor: | NCARB |
|---|---|
| Exam Name: | ARE 5.0 Project Management (PjM) |
| Exam Number: | PjM |
| Real Exam Qty: | 75 |
| Exam Price: | $235 USD |
| Exam Duration: | 180 minutes |
| Related Certifications: | Architect Registration Examination (ARE 5.0) Architect Licensure |
| Exam Format: | Hotspot, Check-all-that-apply, Multiple Choice, Case Study, Drag-and-place |
| Available Languages: | English |
| Passing Score: | Scaled score determined by NCARB |
| Certificate Validity Period: | No rolling clock expiration policy |
| Sample Questions: | DOWNLOAD DEMO |
| Exam Way: | Computer-based exam delivered at PSI test centers and online proctored locations |
| Pre Condition: | Candidates must obtain ARE eligibility through a U.S. jurisdiction and typically complete or be actively completing the Architectural Experience Program (AXP). |
| Official Syllabus URL: | https://www.ncarb.org/pass-the-are/prepare/project-management |
NCARB Project-Management Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Topic 1: Resource Management | 15% | - Project Team Management
|
| Topic 2: Project Work Planning | 30% | - Risk and Quality Management
|
| Topic 3: Contracts | 25% | - Consultant and Contractor Agreements
|
| Topic 4: Project Execution | 30% | - Project Delivery
|
Project-Management Exam FAQ: Formats, Membership, and Facts
Yes ā that is what the three versions are for. The online test engine runs on any electronic device and keeps working even without internet, so commutes and waiting rooms become Project-Management exam practice time. The PDF version prints out for reading anywhere and sharing with friends, and the PC test engine simulates the formal test atmosphere when you are at a desk. All three carry the same daily-checked NCARB ARE 5.0 Project Management (PjM) bank, so spare moments in any format add up to the same preparation.
The official outline divides the Project-Management exam into weighted domains, including:
- Resource Management (15%)
- Project Work Planning (30%)
- Project Execution (30%)
The NCARB ARE 5.0 Project Management (PjM) practice questions at PracticeVCE map onto these same objectives, so spare-time study in any format stays on target.
The Project-Management exam is the official assessment behind the NCARB ARE 5.0 Project Management (PjM) certification from NCARB, and it has earned wide recognition in recent years. Its difficulty is real, which is precisely why the credential carries weight. Candidates who want to prepare with less time and money are best served by efficient, objective-focused material ā and by using spare moments consistently rather than waiting for free weeks that never come.
The Project-Management exam contains 75 questions with 180 minutes minutes to complete them. Timed practice in the test engine under the same limit turns that constraint into a trained habit.
Passing the Project-Management exam requires Scaled score determined by NCARB, and registration costs $235 USD. Careful preparation protects that investment ā and our written refund policy exists to reduce the economic loss if a covered attempt still does not go your way.
Candidates must obtain ARE eligibility through a U.S. jurisdiction and typically complete or be actively completing the Architectural Experience Program (AXP).
Yes. After you become a member at PracticeVCE, discounts are offered on your purchases ā our way of rewarding candidates who prepare with us across more than one exam. Offers change from time to time, so ask our 24/7 team about the current member discount before you check out the NCARB ARE 5.0 Project Management (PjM) materials. Combined with the free trial and 365 days of free updates, membership makes the Project-Management exam package noticeably better value.
NCARB ARE 5.0 Project Management (PjM) Sample Questions:
What is the architect's role regarding shop drawings?
- A. Approving changes without owner input
- B. Preparing and submitting them to the owner
- C. Issuing shop drawings to subcontractors
- D. Reviewing them for compliance with design intent
Correct Answer: D š³ļø
Explanation: Only visible for PracticeVCE members. You can sign-up / login (it's free).
Near the end of a routine job site visit, the architect begins to assemble notes. The owner's representative then arrives on site unexpectedly. The architect, owner's representative, and contractor discuss and resolve several outstanding project issues. The architect begins writing correspondence to distribute to the project team when the architect returns to the office.
In addition to a Meeting Record, which of the following documents should the architect create?
- A. Email Message
- B. Field Observation Report
- C. Action Item List
Correct Answer: C š³ļø
Explanation: Only visible for PracticeVCE members. You can sign-up / login (it's free).
What is the architect's responsibility regarding code compliance during design?
- A. Inspecting construction for code compliance
- B. Issuing building permits
- C. Designing structural systems for code compliance
- D. Preparing design documents in accordance with applicable codes
Correct Answer: D š³ļø
Explanation: Only visible for PracticeVCE members. You can sign-up / login (it's free).
Evaluation and mitigation of indoor air quality in an existing facility assessment would include participation by which of the following? Check the three that apply.
- A. Architect
- B. Industrial hygienist
- C. Mechanical engineer
- D. Electrical engineer
- E. Structural engineer
- F. Industrial engineer
Correct Answer: A,B,C š³ļø
Explanation: Only visible for PracticeVCE members. You can sign-up / login (it's free).
While conducting a site visit for a residential tower delivered through the design-build method, an architect observes several construction workers without hard hats and other unsafe working conditions.
How should the architect proceed?
- A. Document the unsafe working conditions and send a memo to the contractor copying the owner.
- B. Document the unsafe working conditions and send a memo to the owner copying the contractor.
- C. Immediately instruct construction workers on which safety precautions need to be taken.
- D. Request that the contractor review safety precautions that need to be taken with construction workers.
Correct Answer: A š³ļø
Explanation: Only visible for PracticeVCE members. You can sign-up / login (it's free).