Validity and reliability anchor the SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing (1709) bank at PracticeVCE — C-TS420-1709 content refined against the live exam outline, answers verified by IT specialists, and daily checks that keep everything current.
SAP C-TS420-1709 Exam Overview:
| Certification Vendor: | SAP |
|---|---|
| Exam Name: | SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing (1709) |
| Exam Number: | C-TS420-1709 |
| Real Exam Qty: | 80-92 |
| Exam Price: | $549 USD |
| Certificate Validity Period: | Retired; previously valid 5 years, extended 12 months after retirement |
| Passing Score: | 60% |
| Exam Duration: | 180 minutes |
| Available Languages: | English, Japanese, German, Spanish, Korean, Simplified Chinese |
| Exam Format: | Multiple Choice, Multiple Response |
| Related Certifications: | C_TS422_1809 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP6 SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7 |
| Recommended Training: | SAP Learning Hub SCM130 - Planning and Manufacturing Overview |
| Exam Registration: | SAP Certification Hub SAP Training & Certification Shop Pearson VUE SAP Testing |
| Sample Questions: | DOWNLOAD DEMO |
| Exam Way: | Online proctored via SAP Certification Hub or onsite at authorized testing centers; retired, no longer available for new registration |
| Pre Condition: | Basic knowledge of SAP S/4HANA, production planning, and manufacturing processes; no mandatory prerequisites |
| Official Syllabus URL: | https://training.sap.com/certification/c_ts420_1709-sap-certified-application-associate-sap-s-4hana-production-planning-and-manufacturing-1709/ |
SAP C-TS420-1709 Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Topic 1: Integration with Other Modules | <8% | - Integration with Finance and Controlling - Integration with Sales and Distribution |
| Topic 2: Material Requirements Planning in SAP ERP | >12% | - Planning strategies - MRP basics and run steps - Lot-sizing procedures - Long-term planning and master production scheduling |
| Topic 3: Demand Management | 8%-12% | - Consumption-based planning - Planned independent requirements - Make-to-stock and make-to-order strategies |
| Topic 4: Capacity Planning | 8%-12% | - Capacity evaluation and leveling - Capacity availability check - Work center capacity checks |
| Topic 5: Introduction to SAP S/4HANA | 8%-12% | - SAP HANA database architecture - SAP Fiori UX and embedded analytics - S/4HANA simplifications and innovations |
| Topic 6: Production Orders in SAP ERP | >12% | - Order status management - BOM item categories - Availability check and material staging - Routing selection and order confirmation |
| Topic 7: Master Data in SAP S/4HANA | 8%-12% | - Work centers and production versions - MRP areas and plant parameters - Material master, BOM, and routing |
| Topic 8: Advanced Planning in SAP S/4HANA | >12% | - Alert monitor and planning board - Advanced planning concepts and master data - Detailed scheduling processes |
| Topic 9: Lean Manufacturing and Kanban | <8% | - Repetitive manufacturing - Kanban setup and control cycle |
SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing (1709) Questions, Answered Honestly
- Advanced Planning in SAP S/4HANA (>12%)
- Lean Manufacturing and Kanban (<8%)
- Master Data in SAP S/4HANA (8%-12%)
SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing (1709) Sample Questions:
What is SAP's strategic solution to perform Sales and Operations planning when you use SAP S/4HANA
Manufacturing?
Please choose the correct answer.
Response:
- A. Integrated Business Planning
- B. PP Standard Sales and Operations Planning
- C. Flexible Planning
- D. APO Demand Planning
Correct Answer: A 🗳️
What are prerequisites for using batch derivation?
There are 2 correct answers to this question.
Response:
- A. Batch determination selection conditions
- B. Process instructions
- C. Batch where-used list
- D. Receiver-sender relationships
Correct Answer: C,D 🗳️
For which data objects do you have to set up CIF integration models in S/4HANA to use them in
advanced planning?
There are 2 correct answers to this question.
Response:
- A. Work center
- B. Material master
- C. Production plant
- D. Contract
Correct Answer: C,D 🗳️
In which customizing activity do you set up automatic routing selection for production orders?
Please choose the correct answer.
Response:
- A. Define production scheduling profile
- B. Define scheduling parameters for production orders
- C. Define selection profiles
- D. Define order-type-dependent parameter
Correct Answer: D 🗳️
For which planning-relevant data objects do you set just one indicator to include then in PP/DS?
There are 2 correct answers to this question.
Response:
- A. Plant
- B. Production version
- C. Material
- D. Work center
Correct Answer: C,D 🗳️
Viewing page 1 out of 19 pages.
Viewing questions 1-5 out of 92 questions.

1069 Customer Reviews
