Every certification journey reaches the same point: the exam itself. PracticeVCE prepares you for that moment with a current C-TS422-2022 question bank covering the SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing objectives — expert-verified answers, free demo first, instant delivery in 2026.
SAP C-TS422-2022 Exam Overview:
| Certification Vendor: | SAP |
|---|---|
| Exam Name: | SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing (C_TS422_2022) |
| Exam Number: | C-TS422-2022 |
| Passing Score: | Approximately 65% |
| Real Exam Qty: | 80 questions (approximate) |
| Related Certifications: | SAP Certified Application Associate - SAP S/4HANA Sourcing and Procurement SAP Certified Application Associate - SAP S/4HANA Supply Chain |
| Certificate Validity Period: | SAP certification policy dependent (often no fixed expiration; subject to SAP certification updates) |
| Exam Price: | USD 560 (may vary by region) |
| Exam Duration: | 180 minutes |
| Available Languages: | Japanese, Spanish, German, English |
| Exam Format: | Multiple Response, Multiple Choice |
| Recommended Training: | SAP Learning Hub SAP S/4HANA Production Planning and Manufacturing Training Courses |
| Exam Registration: | SAP Training and Certification Shop SAP Certification Hub |
| Sample Questions: | DOWNLOAD DEMO |
| Exam Way: | Online proctored exam or authorized test center delivery via SAP Certification platform |
| Pre Condition: | Basic understanding of SAP S/4HANA and enterprise resource planning (ERP) concepts is recommended; prior hands-on experience with SAP S/4HANA Production Planning is beneficial but not mandatory. |
| Official Syllabus URL: | https://learning.sap.com/certifications |
SAP C-TS422-2022 Exam Syllabus Topics:
| Section | Objectives |
|---|---|
| Capacity Planning and Shop Floor Control | - Finite scheduling concepts - Capacity evaluation and leveling - Shop floor execution monitoring |
| Production Execution | - Production order creation and processing - Order confirmations and backflush - Goods issue and goods receipt processes |
| Master Data in Production Planning | - Work Centers and Capacity planning basics - Bill of Materials (BOM) management - Routings and task lists |
| Material Requirements Planning (MRP) | - MRP types and planning strategies - MRP runs and planning results evaluation - Demand management and forecasting integration |
| SAP S/4HANA Production Planning Overview | - Introduction to SAP S/4HANA PP and Manufacturing processes - Integration with other SAP S/4HANA modules |
| Advanced Planning and Manufacturing Scenarios | - Repetitive manufacturing basics - Discreet manufacturing processes - Integration with supply chain processes |
C-TS422-2022 Exam Details and PracticeVCE Policies
The procedure is easy and time-saving. As soon as you pay, you receive an email with the complete C-TS422-2022 file attached — typically within about a minute — plus an instant download link, so you can download immediately and devote yourself to studying. If nothing arrives within two hours, check your spam folder and contact support. Store the materials on your phone, pad, or computer and install without limits. Updates are free for 365 days, emailed automatically on release, with a 50% renewal discount afterward.
One less thing to be nervous about. If you fail the corresponding exam within 60 days of purchase, send us a scanned copy of your enrollment slip and your official Score Report PDF within two days of the exam date; verified claims receive a full refund within seven days. Exclusions: exams taken within three days of purchase, candidate names that differ from the payer, and free or expired products. Prefer another attempt with different materials? Exchange your product for two others of equal value at no charge.
The latest exam information lists 80 questions (approximate) questions for the C-TS422-2022 exam within a 180 minutes-minute window. Practicing under those exact conditions is the best cure for exam-day surprises.
The SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing blueprint is organized around these core domains:
- Advanced Planning and Manufacturing Scenarios
- Material Requirements Planning (MRP)
- Capacity Planning and Shop Floor Control
Further domains appear in the full official outline; the question bank covers all of them.
By fitting study into the cracks of a busy life. The C-TS422-2022 bank contains complete questions with expert-verified answers across the SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing objectives, stored easily on your phone, pad, or computer for spare-time review — and the PDF prints cleanly when you prefer paper, because marking key points by hand genuinely enhances memory. Assess everything first through the free demo on our site, pay securely through the Credit Card system, and rest assured your personal information is never shared with third parties without permission.
SAP lists the following official training resources:
Structured courses pair well with spare-time question practice for steady, low-stress progress.
SAP specifies these prerequisites for the SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing: Basic understanding of SAP S/4HANA and enterprise resource planning (ERP) concepts is recommended; prior hands-on experience with SAP S/4HANA Production Planning is beneficial but not mandatory..
Check the authoritative wording on the official certification page before booking.
At present, the C-TS422-2022 exam requires a passing score of Approximately 65%, and registration costs USD 560 (may vary by region). SAP sets both figures and may adjust them, so verify on the official site before you schedule.
Use the official registration channels below:
Pick a test center or online slot that suits your routine, and book early — calm planning beats last-minute pressure.
SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing Sample Questions:
If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement?
- A. Fill up based on the lot size procedure.
- B. Fill up to the safety stock level.
- C. Fill up to the reorder stock level.
- D. Fill up to the maximum stock level.
Correct Answer: A 🗳️
Explanation: Only visible for PracticeVCE members. You can sign-up / login (it's free).
Which master data fields can have an impact on whether MRP creates planned orders or purchase requisitions for a material?
Note: There are 2 Correct answers to this question?
- A. Procurement Type
- B. Material Type
- C. MRP type
- D. MRP Groups
Correct Answer: A,C 🗳️
Explanation: Only visible for PracticeVCE members. You can sign-up / login (it's free).
For a production version to be valid and consistent, what requirements must be fulfilled? Note:There are 3 correct answers to this question.
- A. The deletion flag must NOT be set for the bill of material (BOM) or the routing
- B. The assigned routing and bill of material (BOM) must be valid in the entirevalidity period.
- C. The lot size range must be within the lot size range of the assigned routing.
- D. The assigned routing must NOT have alternative sequences
- E. The assigned routing must be a rate routing.
Correct Answer: A,B,C 🗳️
Explanation: Only visible for PracticeVCE members. You can sign-up / login (it's free).
Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks?
Note: There are 2 correct answers to this question.
- A. Use batch derivation.
- B. Use batch determination
- C. Use the batch where-used list.
- D. Use the Batch Information Cockpit.
Correct Answer: C,D 🗳️
Explanation: Only visible for PracticeVCE members. You can sign-up / login (it's free).
You want to insert an operation at a certain time on a work center in the graphical planning table. The planning direction is forward. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched, how does the insertion take place?
- A. The new operation is inserted at the desired time; the previous dispatched operation is moved forward.
- B. The previously dispatched operation stays as is; the new operation is inserted after the dispatched operation.
- C. The new operation is inserted at the desired time; the previously dispatched operation is moved backward
- D. The previously dispatched operation stays as is; the new operation is inserted before the dispatched operation.
Correct Answer: C 🗳️
Explanation: Only visible for PracticeVCE members. You can sign-up / login (it's free).