1z0-1057-22 Premium Files Updated May-2024 Practice Valid Exam Dumps Question [Q65-Q88]

Share

1z0-1057-22 Premium Files Updated May-2024 Practice Valid Exam Dumps Question

Practice with 1z0-1057-22 Dumps for Project Financials Management Cloud Certified Exam Questions & Answer


Oracle 1z0-1057-22 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Navigation, User, Personalization and Approvals
  • Describe the Applications Security Console
Topic 2
  • Describe the components of Oracle Project Management Cloud
  • Set up Project Financial Management Organizations
Topic 3
  • Configure Project Cross Charging and Transfer Pricing
  • Explain the components available for integration
Topic 4
  • Configure Project Cost Collection Center
  • Explain capitalized interest calculations
Topic 5
  • Set up Project Calendars and Periods
  • Set up approval and notification tasks
  • Project Management Overview
Topic 6
  • Describe the Rapid Implementation Workbook
  • Describe the business processes that are supported by approvals and workflows
Topic 7
  • Configure and Manage Project Invoicing and Revenue
  • Describe common project execution components
Topic 8
  • Configure Social Network for Project Execution
  • Describe Functional Setup Manager
Topic 9
  • Configure Project Resource Management
  • Configure Project Performance Reporting


Oracle 1z0-1057-22 exam is designed for professionals who want to demonstrate their expertise in implementing Oracle Project Management Cloud 2022 solutions. Oracle Project Management Cloud 2022 Implementation Professional certification exam is intended for individuals who have a strong understanding of project management principles, methodology, and techniques, along with experience in implementing Oracle Cloud solutions. 1z0-1057-22 exam tests the candidate's knowledge and skills in various areas related to Oracle Project Management Cloud 2022, such as project planning, execution, monitoring, and control.

 

NEW QUESTION # 65
Your client uses Resource Breakdown Structures (RBS) and Resource Mapping to associate amounts to resources. After making some changes to the resources at project level, forecasts are regenerated. After reviewing the cost amounts associated with the resources, you suspect that the cost association does not match your client's expectations. Identify two valid rules based on which cost association works. (Choose two.)

  • A. If one branch contains a user-defined resource type, precedence is given to the branch that contains a user-defined resource type.
  • B. If the sum of precedence numbers is the same for more than one branch, precedence is given to the branch with the lowest number at the lowest level.
  • C. If a transaction maps to more than one level, Oracle PPM Cloud sums the precedence numbers for all resource type in the branch and gives precedence to the resource element in the branch with the highest sum.
  • D. If there is only one level in RBS to which the transaction maps, the cost amounts are mapped to that level.

Answer: B,D

Explanation:
Reference https://docs.oracle.com/cd/E37583_01/doc.1116/e22598/F458900AN13D82.htm How Resource Mapping Is Calculated You can track the cost impact of every resource that has been assigned to a project task and use the resource breakdown structure to view the breakdown of these costs. Oracle Fusion Projects associates the costs of the resources used for tasks with branches and levels in the resource breakdown structure. The process for determining the correct association is managed by rules of precedence.
Oracle Fusion Projects uses the following rules to associate cost amounts with resources:
Select the lowest level in the resource breakdown structure to which a transaction can map.
If there is only one level to which the transaction maps, the cost amounts are mapped to that level.
If the transaction maps to more than one level, Oracle Fusion Projects sums the precedence numbers for all resource types in the branch and gives precedence to the resource element in the branch with the lowest sum.
If more than one branch has the lowest precedence number at the lower level, the application uses the precedence number of the next level up.
If the sum of precedence numbers is the same for more than one branch, precedence is given to the branch with the lowest number at the lowest level.
If one branch contains a user-defined resource type, precedence is given to the branch that does not contain a user-defined resource type.
Note Oracle Fusion Projects gives more precedence to a lower precedence number. For example, a resource element with a precedence number of 1 is given precedence over a resource element with a precedence number of 10.


NEW QUESTION # 66
You have a small project for a period of five months. Your budget amount for each month is spread evenly and is $1000 per month. The first month actual expense is $800 and there is a commitment for $600. Now you generate a forecast at the beginning of the second month. Identify the monthly Estimate-To-Complete (ETC) amount that the application would calculate for the remaining four periods, when the ETC generation method includes commitments. (Choose the best answer.)

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: B

Explanation:
Budget 5,000 Actuals 800 Commitment 600
ETC = Budget - Actuals - Commitment
ETC = 5,000-800-600 = 3,600 Budget available for next 4 months = 3,600/4 = 900/month


NEW QUESTION # 67
Your customer has the following setups on the project plan type that they are using for their projects:
Use Task Planned Dates as Task Assignment Dates = Yes
Automatically Roll Up Task Planned Dates = Yes
Synchronize Task Transaction Dates with Planned Dates = No
With these setups in place, you perform the following actions:
1. Create a new subtask (Sub Task 1) with a start date of 15-Jun-2016 on the project that has as start date of 01-Jul-2016.
2. Create another new subtask (Sub Task 2) after the previous action is saved.
What would the correct behavior of the application be after these actions? (Choose the best answer.)

  • A. After the creation of Sub Task 1, Project Start Date would remain unchanged as 01-Jul-2016 and Sub Task 2 would be created with 15-Jun-2016.
  • B. After the creation and saving of Sub Task 1, Task Start Date would be changed to 01-Jul-2016 and Sub Task 2 would be created with 01-Jul-2016.
  • C. After the creation of Sub Task 1, Project Start Date would be changed to 15-Jun-2016 and Sub Task 2 would be created with 15-Jun-2016.
  • D. Project Start Date would remain unchanged as 01-Jul-2016 for both actions but the start dates on both subtasks would remain 15-Jun-2016.

Answer: C

Explanation:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/oapjf/manage-project-plan-tasks-and-task-assignments.html#OAPJF75076


NEW QUESTION # 68
Your customer has a requirement to allow adjustment and reversals for transactions imported from an external expense entry system.
Which section on the Manage Project Transaction Sources page will allow you to enable these options?

  • A. Transaction Source
  • B. Transaction Entries
  • C. Document Entries
  • D. Documents

Answer: C

Explanation:
The section on the Manage Project Transaction Sources page that will allow you to enable these options is Document Entries. This section allows you to define the attributes and options for each document entry type that is associated with a transaction source. A document entry type represents a group of transactions that have similar characteristics and processing rules. For example, you can define a document entry type for expense reports and enable adjustment and reversal options for this document entry type. The Documents section allows you to define the attributes and options for each document type that is associated with a transaction source. A document type represents a source document that contains one or more transactions. For example, you can define a document type for expense reports and enable validation and transfer options for this document type. The Transaction Source section allows you to define the attributes and options for each transaction source that is used to import transactions from an external system. A transaction source represents a system or application that provides transactions to Oracle Fusion Project Costing. For example, you can define a transaction source for expense reports and enable costing and accounting options for this transaction source. The Transaction Entries section allows you to review and manage the transactions that are imported from an external system using a transaction source. You can view, edit, adjust, reverse, validate, and transfer transactions in this section. Reference: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/20c/oapfm/manage-project-costs.html#OAPFM2356241


NEW QUESTION # 69
Which three are valid password complexity criteria while setting up password policies? (Choose three.)

  • A. Very Complex: At least 8 characters, 1 uppercase, 1 number, and 2 special characters
  • B. Complex: At least 8 characters, 1 uppercase, and 1 number
  • C. Simple: At least 8 characters and 1 number
  • D. Very Complex: At least 6 characters, 1 uppercase, 1 number, and 1 special character
  • E. Very Complex: At least 8 characters, 1 uppercase, 1 number, and 1 special character

Answer: A,B,E

Explanation:
Password complexity criteria are criteria that determine how strong or secure a password must be for a user account. Password complexity criteria can include requirements such as minimum length, uppercase letters, lowercase letters, numbers, special characters, etc. Three of the valid password complexity criteria while setting up password policies are:
Complex: At least 8 characters, 1 uppercase, and 1 number
Very Complex: At least 8 characters, 1 uppercase, 1 number, and 2 special characters Very Complex: At least 8 characters, 1 uppercase, 1 number, and 1 special character Simple: At least 8 characters and 1 number is not a valid password complexity criterion while setting up password policies, as this criterion does not meet the minimum security standards for Oracle Cloud applications. Very Complex: At least 6 characters, 1 uppercase, 1 number, and 1 special character is also not a valid password complexity criterion while setting up password policies, as this criterion does not meet the minimum length requirement of 8 characters for Oracle Cloud applications. Reference: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/20c/oapfm/set-up-project-financial-management.html#OAPFM2356271


NEW QUESTION # 70
You are set up as a Follower in Manage Tasks. Which two abilities can you accomplish? (Choose two.)

  • A. Enter progress for tasks.
  • B. Receive email notifications about changes that team members make to a task.
  • C. Edit task details.
  • D. View task details and the task activity stream.

Answer: B,D

Explanation:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19a/oapem/execute-project-tasks-and-deliverables.html#OAPEM1122082 Followers are persons who aren't working on the task but have an interest in reviewing the task progress. Only the resources and other followers can add followers to a task. If a resource assigns the task to another team member, the application automatically changes the original resource to a follower.
What's the difference between my tasks and tasks that I follow?
You can edit task details and enter progress for your tasks on the Manage Tasks page. If a task has multiple resources, only the primary resource can edit the task.
When you follow a task, you can view the task details and see the task activity stream. You receive e-mail notifications of changes that team members make to the task.
If a resource reassigns the task to another team member, then the previous resource automatically becomes a follower.


NEW QUESTION # 71
In a Project Draft Invoice preview, quantity (hours) and unit price (bill rate) are shown as fields on the invoice. Quantity and unit price are then used to calculate the line total, then the total price of the invoice. After the invoice is transferred or created in Receivables, the invoice detail has a quantity of 1, and a unit price equal to the line total. The detailed Unit Price/Quantity does not come through on the Receivables invoice.
Identify the correct statement about details in the receivables invoice. (Choose the best answer.)

  • A. The project sends the invoice line description and the invoice distributions to Receivables, but not the invoice header.
  • B. The project sends only the invoice header to Receivables, not the invoice line description and distributions.
  • C. The project sends the invoice header, invoice line description, and the invoice distributions to Receivables.
  • D. The project sends only the invoice header and invoice line description to Receivables, not the invoice distributions.

Answer: D

Explanation:
When a project invoice is transferred or created in Receivables, the project sends only the invoice header and invoice line description to Receivables, not the invoice distributions. The invoice distributions contain the detailed information such as quantity, unit price, and line total. Therefore, the Receivables invoice does not show these details, but only shows a quantity of 1 and a unit price equal to the line total. Reference: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/20c/oapfm/manage-project-invoices.html#OAPFM2355931


NEW QUESTION # 72
Which product offering enables you to collaboratively plan and deliver projects by leveraging intuitive and integrated scheduling tools?

  • A. Project Management
  • B. Resource Management
  • C. Project Costing
  • D. Project Control

Answer: A

Explanation:
Project Management is the product offering that enables you to collaboratively plan and deliver projects by leveraging intuitive and integrated scheduling tools. Project Management allows you to create and manage project plans, tasks, deliverables, issues, milestones, gates, etc. using various methods and sources. You can also monitor and control project progress and performance using dashboards and reports. Resource Management is the product offering that enables you to optimize the utilization and allocation of resources for projects and tasks. Resource Management allows you to create and manage resource requests, assignments, pools, calendars, etc. using various criteria and sources. You can also monitor and analyze resource availability and demand using dashboards and reports. Project Control is the product offering that enables you to simplify the planning, budgeting, and forecasting capabilities for projects and tasks. Project Control allows you to create and manage project budgets, forecasts, financial plans, etc. using various methods and sources. You can also monitor and control project costs and variances using dashboards and reports. Project Costing is the product offering that enables you to capture and process project costs from various sources and applications. Project Costing allows you to create and manage project transactions, expenditures, assets, etc. using various rules and options. You can also generate project costing and accounting entries using dashboards and reports. Reference: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/20c/oapfm/overview-project-financial-management.html#OAPFM2356301


NEW QUESTION # 73
Your customer wants additional project information for detailed account balance maintenance, reconciliation, and reporting. Identify the configuration in subledger accounting that can be set up to fulfill this requirement. (Choose the best answer.)

  • A. Journal Rules
  • B. Supporting Reference
  • C. Mapping Sets
  • D. Accounting Method
  • E. Accounting Rule

Answer: B

Explanation:
Reference https://docs.oracle.com/cloud/latest/projectcs_gs/OAPFM/OAPFM1125357.htm#OAPFM1125357 Assignment of Supporting Reference Supporting references may be used to capture transaction values on journal entry lines. A supporting reference can be used on a journal entry rule set only if it's assigned a source from the event class of the journal entry rule set.
Creating Supporting Reference: Explained
Supporting references are used to store additional source information about a subledger journal entry at the line level.
Supporting references with balances establish subledger balances for a particular source and account for a particular combination of supporting references plus the account combination.
For example:
If a journal line contains a supporting reference that includes two sources, Customer Type and Customer Name.
Balances are created for the account combination, plus customer name and customer type.
Examples of how you may want to use supporting reference balances are to:
Facilitate reconciliation back to the subledgers and source systems by tagging journal entries with transaction and reference attributes.
Create balances by dimensions not captured in the chart of accounts.
Reporting using dimensions not captured in the chart of accounts.
Enrich Oracle Fusion Business Intelligence Applications reporting on subledger journals.
Profit and loss balances by dimensions not captured in the chart of accounts Define supporting references to hold additional supporting information for detailed account balance maintenance or reconciliation and reporting requirements.


NEW QUESTION # 74
Shift is one of the key elements in defining project and resource calendars.
Which two additional key elements are required to define the project and resource calendars? (Choose two.)

  • A. Time off
  • B. Workday Patterns
  • C. Expenditure Type
  • D. Accounting Calendar
  • E. Schedule Exceptions

Answer: C,E


NEW QUESTION # 75
In your customer site, the capitalized interest calculation is implemented on their project types. Which option represents the costs considered in the interest calculation? (Choose the best answer.)

  • A. expenditure type exclusions on the Capitalized Interest rate schedules
  • B. expenditure type exclusions on the Capitalized Interest rate name
  • C. expenditure items whose cost spreads across multiple assets that are capitalized
  • D. common costs on the project/task
  • E. expenditure items whose costs are applied to a single asset or multiple assets

Answer: E

Explanation:
Reference https://fusionhelp.oracle.com/helpPortal/topic/TopicId_P_988B43C997365159E040D30A68813832
https://docs.oracle.com/cd/E48434_01/fusionapps.1118/e49622/F1125377AN61D92.htm


NEW QUESTION # 76
Your customer complains that their project resources do not report their time promptly, which has resulted in incorrect reporting of project performance. What should you do to fix this problem? (Choose the best answer.)

  • A. Enable track missing time at project type.
  • B. Enable track missing time at project unit.
  • C. Enable track missing time at project template.
  • D. Enable track missing time at business unit.

Answer: B


NEW QUESTION # 77
Which five steps are required for the File-Based Data Import Integration option?

  • A. Download an Excel template.
  • B. Validate the sheet using the Validate option.
  • C. Run Process to transfer data to interface tables.
  • D. Populate the spreadsheet with data and generate a CSV file.
  • E. Install an Excel add-in.
  • F. Upload the file to the server.
  • G. Import data into various applications.

Answer: A,C,D,E,F

Explanation:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/oefpp/overview.html#External_Data_Integration_Services_for_Oracle_Cloud_Overview


NEW QUESTION # 78
Your organization has been awarded a new contract based on which you are allowed to sell:
Items not tracked in inventory
Inventory items
Services
Which contract structure would fulfill your requirement of item sales? (Choose the best answer.)

  • A. Create two contract lines with a line type each of "product, project-based, sell agreement, standalone" and "sell intent, item, project-based".
  • B. Create two contract lines with a line type each of "sell intent, item, project-based' and "subscription, project-based, sell".
  • C. Create two contract lines with a line type each of "sell intent, free-form, project-based" and "sell intent, item, project-based".
  • D. Create two contract lines with a line type each of "free-form, project-based buy agreement" and "bundle sell, project-based".

Answer: C


NEW QUESTION # 79
Which three features are part of Oracle Fusion Functional Setup Manager?

  • A. export and import services for setup data migration between environments
  • B. modifying an existing implementation project task list by selecting more functional areas when needed
  • C. updating an implementation project task list by changing the opt-in configuration to suit the latest requirements
  • D. feature opt-in for a best fit configuration
  • E. guided task list for end-to-end setup requirements

Answer: A,D,E

Explanation:
https://docs.oracle.com/en/cloud/saas/applications-common/r13-update17d/oafsm/applications-cloud-using-functional-setup-manager.pdf Functional Setup Manager offers the following:
* Standardized application configuration and setup experience
* Feature opt-in for a best fit configuration
* Flexible processes for managing setup:
◦ Setup by functional areas for an adopt-as-you-go approach
◦ Implementation projects to manage setup
◦ Upload file to enter setup data in bulk
* Guided task list for end-to-end setup requirements
* Export and import services for setup data migration between environments
* Comprehensive reporting on setup data


NEW QUESTION # 80
Stigma consulting has been hired by a client to implement Project Management Cloud. Which role should they assign to a user for using the rapid implementation feature to set up the Project Financial Management offering by populating and uploading a Microsoft Excel workbook?

  • A. Project Integration Specialist
  • B. Project Application Administrator
  • C. Project Executive
  • D. Project Administrator

Answer: D


NEW QUESTION # 81
Which component of performance measures allows you to select the method that is used to measure accounts such as budget, forecast, and actual?

  • A. Accounts Member
  • B. Scenario Member
  • C. Category Member
  • D. Time Member

Answer: A


NEW QUESTION # 82
Your organization performs revenue recognition based on the Labor and Non-labor Burden schedule types. Identify the setup required to enable this kind of revenue recognition. (Choose the best answer.)

  • A. Create a revenue method classification with a revenue method of Percent Spent.
  • B. Create a revenue method classification with a revenue method of Percent Complete.
  • C. Create a revenue method with a revenue method classification of Amount Based.
  • D. Create a revenue method with a revenue method classification of Rate Based.

Answer: D


NEW QUESTION # 83
Stigma consulting has been hired by a client to implement Project Management Cloud. Which role should they assign to a user for using the rapid implementation feature to set up the Project Financial Management offering by populating and uploading a Microsoft Excel workbook?

  • A. Project Application Administrator
  • B. Project Executive
  • C. Project Integration Specialist
  • D. Project Administrator

Answer: C

Explanation:
The Project Integration Specialist role should be assigned to a user for using the rapid implementation feature to set up the Project Financial Management offering by populating and uploading a Microsoft Excel workbook. This role allows the user to access the Functional Setup Manager and perform the common setups for project costing and billing using predefined templates and spreadsheets. The user can also monitor and validate the setup data using reports and dashboards. Reference: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/20c/oapfm/implement-project-financial-management-applications.html#OAPFM2356151


NEW QUESTION # 84
Which three are valid password complexity criteria while setting up password policies? (Choose three.)

  • A. Very Complex: At least 8 characters, 1 uppercase, 1 number, and 2 special characters
  • B. Complex: At least 8 characters, 1 uppercase, and 1 number
  • C. Simple: At least 8 characters and 1 number
  • D. Very Complex: At least 6 characters, 1 uppercase, 1 number, and 1 special character
  • E. Very Complex: At least 8 characters, 1 uppercase, 1 number, and 1 special character

Answer: A,B,E


NEW QUESTION # 85
Your customer wants to calculate Estimate to Complete (ETC) as the difference between Current Planned Cost and Actual Cost. In Progress Settings, which option would you use in conjunction with the ETC method to meet this requirement? (Choose the best answer.)

  • A. Remaining Plan
  • B. Cost
  • C. Manual Entry
  • D. Effort

Answer: B

Explanation:
Reference https://ppm-help.saas.hpe.com/en/9.42/Help/Content/UG/PjMUG/view_pj_cost_data_costtab.htm Below is an example of the Financial Summary view on the Cost tab of the Project Overview page.


NEW QUESTION # 86
You have defined two expenditure types but they are not available for selection when you enter an expenditure batch.
What is the reason for this problem?

  • A. The two expenditure types are not assigned to the reference data set that is assigned to the project expenditure organization in which the transaction is performed.
  • B. The two expenditure types are not assigned to the reference data set that is assigned to the project-owning organization in which the transaction is performed.
  • C. The two expenditure types are not assigned to the reference data set that is assigned to the project unit in which the transaction is performed.
  • D. The two expenditure types are not assigned to the reference data set that is assigned to the business unit in which the transaction is performed.

Answer: D


NEW QUESTION # 87
Where should you specify the Default Capitalized Interest Rate Schedule?

  • A. Manage Project Type page
  • B. Manage Expenditure Type page
  • C. Manage Project Plan Type page
  • D. Manage Capitalized Interest Rate Schedules page
  • E. Manage Capitalized Interest Rates page

Answer: D


NEW QUESTION # 88
......

REAL 1z0-1057-22 Exam Questions With 100% Refund Guarantee : https://www.practicevce.com/Oracle/1z0-1057-22-practice-exam-dumps.html

Get Special Discount Offer on 1z0-1057-22 Dumps PDF: https://drive.google.com/open?id=19zFou00uM-ziUaRK1dyr3NdNYlXMWHe0