2023 Current 300-615 dumps Preparation through Our Practice Test
100% Reliable Microsoft 300-615 Exam Dumps Test Pdf Exam Material
NEW QUESTION # 80
Drag and drop the actions from the left onto the faults that they resolve on the right. Not all options are used.
Answer:
Explanation:

NEW QUESTION # 81
Refer to the exhibit.
A client configures an upgrade of its Cisco Nexus switches that are connected to the Cisco ACI controller, such that the switches are upgraded one at a time. After the upgrade is run, it is discovered that both Cisco Nexus switches were upgraded simultaneously. Which two actions ensure that the switches upgrade one at a time? (Choose two.)
- A. Select the "Graceful Maintenance" checkbox
- B. Configure the *Do not pause on failure and do not wait on cluster health" Run Mode
- C. Choose the 'Pause upon upgrade failure" Run Mode
- D. Place each leaf switch in a different upgrade group
- E. Check the Ignore Compatibility" checkbox
Answer: A,D
NEW QUESTION # 82
Refer to the exhibit.
Refer to the exhibit. To avoid service disruption, an engineer must move the_ server from LEAF_ 1 to LEAF_ _2. After running the test, the engineer noticed that L EAF_ 2 failed to forward network traffic into the VXL AN fabric. The BGP, interface NVE, and VNI were confirmed to be configured as expected. Which two actions must be taken on L EAF_ 2 to resolve the issue? (Choose two.)
- A. Change the fabric forwarding anycast-gateway-mac MAC address.
- B. Remove ip forward from interface VIan30 and add it on interface Vlan100.
- C. Add fabric forwarding mode anycast-gateway on interface Vlan100.
- D. Configure correspondent IP addressing on every interface.
- E. Enable HMM tracking to advertise host routes into the VXL AN fabric.
Answer: A,E
NEW QUESTION # 83
Refer to the exhibit.
A network engineer traces the packet flow from the Veth991 of a blade server toward the core switch. The switch reports performance issues What is the role of the interface Eth1/7?
- A. server interface
- B. IOM network interface
- C. fabric interconnect uplink interface
- D. IOM host interface
Answer: C
Explanation:
E1/7 is border interface, which is used as uplink. All other veth interfaces are SIF, which stands for Server Interface.
NEW QUESTION # 84
Refer to the exhibit.
Refer to the exhibit. The monitoring team reports an inability to access the devices after a new centralized management integration. Which action resolves the issue?
- A. Modifly the SNMP ACL to allow the incoming request packets.
- B. Enable SHA authentication for the admin user.
- C. Update the community string.
- D. Change the admin user permissions to write.
Answer: C
NEW QUESTION # 85
Refer to the exhibit.
An upgrade operation fails with an error displayed. Which action resolve the issue?
- A. Use a different kickstart image
- B. Allocate extra space on a flash drive to extract a system image
- C. Allocate extra space on a flash drive to extract a kickstart image
- D. Use a different system image
Answer: D
Explanation:
Explanation
Kickstart image verification succeeded. System image has failed.
NEW QUESTION # 86
A Cisco Nexus 9000 Series Switch crashes and fails to boot. An engineer must recover the switch and investigate the issue. The switch uses 172.20.50.213/24 IP address for management and its default gateway is 172.20.50.254. Drag and drop the steps for recovering the Cisco Nexus 9000 Series Switch from the left onto the right. Not all steps are used.
Select and Place:
Answer:
Explanation:
NEW QUESTION # 87 
Refer to the exhibit. The initiator that has FC ID 0x970102 fails to communicate with the target that has FC ID
0x970200. What action resolves the issue?
- A. Reconfigure the initiator and the target to be in the same zones.
- B. Reactivate the zoneset.
- C. Reset the port for FC ID 0x970102 and FC ID 0x970200 to log in to the fabric.
- D. Reset the port for FC ID 0x970209 and FC ID 0x9700c2 to log in to the fabric.
Answer: B
Explanation:
Section: Storage Network
NEW QUESTION # 88
Refer to the exhibit.
A new Cisco Nexus 5548 Switch connects to a network. SAN switching is configured on the switch. The switch fc2/10 NP uplink is shown in the exhibit. Which action ensures that fc2/10 is in an up state?
- A. Enable NPIV on the upstream switch that connects the port.
- B. Replace the SFP port module in fc2/10.
- C. Configure the BB_credit buffers on the upstream switch that connects the port.
- D. Configure the admin port type E on the upstream switch that connects the port.
Answer: A
NEW QUESTION # 89
Drag and drop the actions from the left onto the faults that they resolve on the right. Not all options are used.
Answer:
Explanation:
NEW QUESTION # 90
Refer to an exhibit.
An engineer is troubleshooting an upgrade failure on a switch. Which action resolves the issue?
- A. Use the same system image as the kickstart image.
- B. Load a new system image.
- C. Save the system image in NVRAM.
- D. Reload the same system image.
Answer: B
NEW QUESTION # 91 
Refer to the exhibit. VSAN traffic is not routed as expected. Which action should be taken to resolve the issue?
- A. Configure the FSPF dead interval with a value higher than 80 seconds
- B. Reset the inactivity timer on switch-2
- C. Configure the hello timer to match the neighbor
- D. Reset the error packet counter
Answer: C
NEW QUESTION # 92
An engineer must configure Linux hosts that are deployed on Cisco UCS B-Series Servers to boot from SAN.
The SAN boot policy is configured in Cisco UCS Manager, and the boot order is verified to be set as expected However, the Linux hosts fail to boot. Which action resolves the issue?
- A. Delete and reconfigure the pWWN of the SAN boot target
- B. Remove all of the local storage that is installed
- C. Remove all of the ISO images that are mounted as a virtual CD-ROM
- D. Delete and reconfigure the boot LUN
Answer: B
NEW QUESTION # 93
Refer to the exhibit.
During implementation of a Cisco UCS C-Series Server, an engineer receives the status that is shown in the exhibit. Which action resolves the issue.
- A. Set SLOT-1 Sync Mode to "Auto"
- B. Configure the RAID that is associated with the card.
- C. Reconfigure the Drive Type from "Removable" to "Non-Removable"
- D. Insert an SD card into SLOT-2
Answer: C
NEW QUESTION # 94
Refer to the exhibit.
- A. Include a private key with the certificate.
- B. Add a 1536-bit key to the APIC GUI.
- C. Use a browser that supports keys of 2048 bits.
- D. Configure a corporate certificate authority for the certificate.
Answer: C
NEW QUESTION # 95
Refer to the exhibit.
A web browser displays a "not secure" warning message when accessing the web interface of Cisco UCS Manager. Which action resolves the issue?
- A. Use a supported web browser.
- B. Use a supported version of UCS Manager.
- C. Use the correct TCP port for HTTPS.
- D. Load third-party certificate to UCS Manager.
Answer: D
NEW QUESTION # 96
A network engineer discovers a DNS resolution problem on a device that is using the Cisco Nexus Bash shell.
The device name is app with an IP address of 10.10.10.1. The primary server IP address is 172.16.10.1 and the secondary server IP address is 172.16.10.2. When the abc.com resolution fails, it should attempt to use efg.com. Which settings must be added to resolv.conf file to resolve the issue?
- A. Option A
- B. Option B
- C. Option B
- D. Option D
Answer: A
Explanation:
Reference:
https://www.cisco.com/c/en/us/support/docs/switches/nexus-9000-series-switches/213959-nx-os-bash-shelldns- configuration.html
NEW QUESTION # 97
A request to activate the port security database is rejected. Which action investigates the cause of the issue?
- A. Use the force option to identify rejected devices.
- B. Enable the auto-learning feature.
- C. Verify that devices are fully attached to the active database.
- D. Find conflicting entries between the active and configuration databases.
Answer: A
Explanation:
Section: Management and Operations
NEW QUESTION # 98
Refer to the Exhibit.
An Engineer cannot log in to the Cisco IMC page of the Cisco UCS C220 server. Which action resolve the issue?
- A. Use the DNS of the Cisco IMC webpage login page instead of the IP address for the connection to be secure.
- B. Se the FQDN of the Cisco IMC webpage login page instead of the IP address for the connection to be secure.
- C. Replace the self-signed certificate that is installed on the Cisco IMC with a user certificate that is signed from the client corporate certificate.
- D. Replace the self-signed certificate that is installed on the Cisco IMC with a server certificate that is signed from the client corporate certificate.
Answer: D
NEW QUESTION # 99
Drag and drop the actions from the left onto the faults that they resolve on the right. Not all options are used.
Answer:
Explanation:
NEW QUESTION # 100
Refer to the exhibit.
The EEM script overrides all events in the system policy. What should be added to the script to resolve the issue?
- A. configure terminal action
- B. event statement
- C. event-default action statement
- D. environment variable
Answer: B
NEW QUESTION # 101
An engineer is troubleshooting a failed DCBX exchange between a server and a Cisco Nexus switch. Which action allows DCBX to successfully negotiate?
- A. Enable Cisco Discovery Protocol.
- B. Enable LLDP.
- C. Enable PFC.
- D. Enable ETS
Answer: B
NEW QUESTION # 102
......
To prepare for the Cisco 300-615 exam, candidates should have a strong understanding of Cisco data center technologies and protocols, as well as experience troubleshooting complex issues in a production environment. 300-615 exam consists of 60-70 questions that must be completed within 90 minutes, and the passing score is 825 out of 1000 points. 300-615 exam is available in English and Japanese and can be taken at any Pearson VUE testing center.
Free 300-615 Dumps are Available for Instant Access: https://www.practicevce.com/Cisco/300-615-practice-exam-dumps.html
Based on Official Syllabus Topics of Actual Cisco 300-615 Exam: https://drive.google.com/open?id=17KQ6yoizcbaxbPkqhxwSWi3ZvLHTCjuV