NEW QUESTION # 14
Which of the following s the most correct statement about state testing techniques?
- A. Static techniques can be used before all code is ready for execution
- B. Static techniques find more detects then dynamic techniques.
- C. Static techniques can be used by inexperienced users.
- D. Static techniques are always cheaper than dynamic techniques.
Answer: A
Explanation:
State testing techniques are a type of dynamic testing techniques that are based on the behavior of the system under test for different input conditions and events. Dynamic testing techniques require the system to be executed with test cases, whereas static testing techniques do not. Static testing techniques can be applied before the code is ready for execution, such as reviews, inspections, walkthroughs, and static analysis. Static testing techniques can help find defects early in the development process, improve the quality of the code, and reduce the cost and effort of dynamic testing. Reference = ISTQB Certified Tester Foundation Level (CTFL) v4.0 Syllabus, Chapter 4, Section 4.2.1, Page 281; ISTQB Glossary of Testing Terms v4.0, Page 292
NEW QUESTION # 15
Which of the following statements about static testing and dynamic testing is true?
- A. Unlike dynamic testing, which can be also performed manually, static testing cannot be performed without specialized tools
- B. Static testing is usually much less cost-effective than dynamic testing
- C. Both static testing and dynamic testing can be used to highlight issues associated with non-functional characteristics
- D. Unlike dynamic testing, which focuses on detecting potential defects, static testing focuses on detecting failures which may be due to actual defects
Answer: C
Explanation:
Explanation
This answer is correct because static testing and dynamic testing are both types of testing that can be used to highlight issues associated with non-functional characteristics, such as usability, performance, security, reliability, etc. Static testing is a type of testing that involves the analysis of software work products, such as requirements, design, code, or test cases, without executing them. Dynamic testing is a type of testing that involves the execution of software work products, such as code or test cases, using inputs and verifying outputs. Both static testing and dynamic testing can be applied to different test levels and test types, and can use different test techniques and tools, to evaluate the non-functional characteristics of the software product. References: ISTQB Glossary of Testing Terms v4.0, ISTQB Foundation Level Syllabus v4.0, Section
2.2.1.1, Section 2.2.1.2
NEW QUESTION # 16
Which of the following work products cannot be examined by static analysis?
- A. Source code
- B. Test plans
- C. Compiled code
- D. Formal models
Answer: B
Explanation:
Static analysis is the process of examining the work products of a software development or testing activity without executing them. Static analysis can be applied to various types of work products, such as requirements, design, code, test cases, etc. However, test plans are not suitable for static analysis, because they are high-level documents that describe the test objectives, scope, strategy, resources, schedule, and risks of a testing project. Test plans are not executable or formalized in a way that static analysis tools can analyze them. Therefore, option A is the correct answer.
NEW QUESTION # 17
Test automation allows you to:
- A. avoid performing exploratory testing
- B. demonstrate the absence of defects
- C. produce tests that are less subject to human errors
- D. increase test process efficiency by facilitating management of defects
Answer: C
Explanation:
Explanation
Test automation allows you to produce tests that are less subject to human errors, as they can execute predefined test scripts or test cases with consistent inputs, outputs, and expected results. Test automation can also reduce the manual effort and time required to execute repetitive or tedious tests, such as regression tests, performance tests, or data-driven tests. Test automation does not demonstrate the absence of defects, as it can only verify the expected behavior of the system under test, not the unexpected or unknown behavior. Test automation does not avoid performing exploratory testing, as exploratory testing is a valuable technique to discover new information, risks, or defects that are not covered by automated tests. Test automation does not increase test process efficiency by facilitating management of defects, as defect management is a separate activity that involves reporting, tracking, analyzing, and resolving defects, which may or may not be related to automated tests. References: ISTQB Certified Tester Foundation Level (CTFL) v4.0 sources and documents:
ISTQB Certified Tester Foundation Level Syllabus v4.0, Chapter 3.3.1, Test Automation1 ISTQB Glossary of Testing Terms v4.0, Test Automation2
NEW QUESTION # 18
An alphanumeric password must be between 4 and 7 characters long and must contain at least one numeric character, one capital (uppercase) letter and one lowercase letter of the alphabet.
Which one of the following sets of test cases represents the correct outcome of a two-value boundary value analysis applied to the password length? (Note: test cases are separated by a semicolon)
- A. 1RhT;rSp53;3N3e10;8sBdby
- B. 1xB: aB11: 99rSp: 5NnN10; 4NnN10T; 44ghWn19
- C. 1xA;aB11;Pq1ZZab;7iDD0a1x
- D. aB11;99rSp:5NnN10;7iDD0a1x
Answer: A
Explanation:
The correct outcome of a two-value boundary value analysis applied to the password length is the set of test cases represented by option D.
Boundary value analysis is a test design technique that focuses on the values at the boundaries of an equivalence partition, such as the minimum and maximum values, or the values just above and below the boundaries. A two-value boundary value analysis uses two values for each boundary, one representing the valid value and one representing the invalid value. For example, if the valid range of values is from 4 to 7, then the two values for the lower boundary are 3 and 4, and the two values for the upper boundary are 7 and 8. The test cases in option D use these values for the password length, while also satisfying the other requirements of the password, such as containing at least one numeric character, one capital letter, and one lowercase letter. The test cases in option D are:
1RhT: a 4-character password that is valid
rSp53: a 5-character password that is valid
3N3e10: a 6-character password that is valid
8sBdby: an 8-character password that is invalid The test cases in the other options are incorrect, because they either use values that are not at the boundaries of the password length, or they do not meet the other requirements of the password. For example, the test cases in option A are:
1xA: a 3-character password that is invalid, but it does not contain a capital letter aB11: a 4-character password that is valid Pq1ZZab: a 7-character password that is valid
7iDD0a1x: an 8-character password that is invalid Reference: ISTQB Certified Tester Foundation Level (CTFL) v4.0 sources and documents:
ISTQB® Certified Tester Foundation Level Syllabus v4.0, Chapter 2.2.1, Black-box Test Design Techniques1 ISTQB® Glossary of Testing Terms v4.0, Boundary Value Analysis, Equivalence Partition2
NEW QUESTION # 19
The acceptance criteria associated with a user story:
- A. are often documented following in rule-oriented format using the following template: "As a [role], I want [feature], so that I can [benefit]"
- B. can be written in different formats and represent an aspect of a user story referred to as confirmation' of the so called "3 C's"
- C. must be written in one of the two following formats: scenario-oriented or rule-oriented
- D. are often written in a rule-oriented format using the template referred to as "Given/When/Then"
Answer: B
Explanation:
Explanation
The acceptance criteria associated with a user story are the conditions that must be met for the user story to be considered done and to deliver the expected value to the user. They are often written in different formats, such as rule-oriented, scenario-oriented, or table-oriented, depending on the nature and complexity of the user story.They represent an aspect of a user story referred to as confirmation, which is one of the so called "3 C's" of user stories. The other two aspects are card and conversation. Card refers to the concise and informal description of the user story, usually following the template: "As a [role], I want [feature], so that I can
[benefit]". Conversation refers to the ongoing dialogue between the stakeholders and the team members to clarify and refine the user story and its acceptance criteria. Therefore, option C is the correct answer.
References: ISTQB Certified Tester Foundation Level Syllabus v4.01, Section 3.2.2, page 35-36; ISTQB Glossary v4.02, page 37.
NEW QUESTION # 20
Consider the following examples of risks identified in different software development projects:
[I]. The contrast color ratio for both normal text and large text of a website does not comply with the applicable accessibility guidelines, making it difficult for many users to read the content on the pages
[II]. A development vendor fails to deliver their software system on time, causing significant delays to system integration testing activities that have been planned as part of a development project for a system of systems
[III]. People in the test team do not have sufficient skills to automate tests at the test levels required by the test automation strategy which does not allow production of an effective regression test suite
[IV]. In a web application, data from untrusted sources is not subject to proper input validation, making the application vulnerable to several security attacks Which of the following statements is true?
- A. [II], [III] and [IV] are product risks; [I] is a project risk
- B. [I] and [IV] are product risks. [II] and [III] are project risks
- C. [I] and [III] are product risks; [II] and [IV] are project risks
- D. [IV] is a product risk; [I]. [II] and [III] are project risks
Answer: B
Explanation:
This answer is correct because product risks are risks that affect the quality of the software product, such as defects, failures, or non-compliance with requirements or standards. Project risks are risks that affect the project's schedule, budget, resources, or scope, such as delays, cost overruns, skill gaps, or scope changes. In this case, [I] and [IV] are product risks, as they relate to the accessibility and security of the software product, which are quality attributes. [II] and [III] are project risks, as they relate to the delivery time and the test automation skills of the test team, which are project factors. Reference: ISTQB Glossary of Testing Terms v4.0, ISTQB Foundation Level Syllabus v4.0, Section 2.1.1.1
NEW QUESTION # 21
Which of the following statements about how different types of test tools support testers is true?
- A. The support offered by a test data preparation tool is often leveraged by testers to run automated regression test suites
- B. The support offered by a bug prediction tool is often used by testers to track the bugs they found
- C. The support offered by a performance testing tool is often leveraged by testers to run load tests
- D. The support offered by a continuous integration tool is often leveraged by testers to automatically generate test cases from a model
Answer: C
Explanation:
Explanation
The support offered by a performance testing tool is often leveraged by testers to run load tests, which are tests that simulate a large number of concurrent users or transactions on the system under test, in order to measure its performance, reliability, and scalability. Performance testing tools can help testers to generate realistic workloads, monitor system behavior, collect and analyze performance metrics, and identify performance bottlenecks. The other statements are false, because:
A test data preparation tool is a tool that helps testers to create, manage, and manipulate test data, which are the inputs and outputs of test cases. Test data preparation tools are not directly related to running automated regression test suites, which are test suites that verify that the system still works as expected after changes or modifications. Regression test suites are usually executed by test execution tools, which are tools that can automatically run test cases and compare actual results with expected results.
A bug prediction tool is a tool that uses machine learning or statistical techniques to predict the likelihood of defects in a software system, based on various factors such as code complexity, code churn, code coverage, code smells, etc. Bug prediction tools are not used by testers to track the bugs they found, which are the actual defects that have been detected and reported during testing. Bugs are usually tracked by defect management tools, which are tools that help testers to record, monitor, analyze, and resolve defects.
A continuous integration tool is a tool that enables the integration of code changes from multiple developers into a shared repository, and the execution of automated builds and tests, in order to ensure the quality and consistency of the software system. Continuous integration tools are not used by testers to automatically generate test cases from a model, which are test cases that are derived from a representation of the system under test, such as a state diagram, a decision table, a use case, etc. Test cases can be automatically generated by test design tools, which are tools that support the implementation and maintenance of test cases, based on test design specifications or test models.
References: ISTQB Certified Tester Foundation Level (CTFL) v4.0 sources and documents:
ISTQB Certified Tester Foundation Level Syllabus v4.0, Chapter 3.4.1, Types of Test Tools ISTQB Glossary of Testing Terms v4.0, Performance Testing Tool, Test Data Preparation Tool, Bug Prediction Tool, Continuous Integration Tool, Test Execution Tool, Defect Management Tool, Test Design Tool
NEW QUESTION # 22
For each of the test cases to be executed, the following table specifies the priority order and dependencies on other test cases
Which of the following test execution schedules is compatible with the logical dependencies and allows executing the test cases in priority order?
- A. TC4, TC3, TC2, TC6, TC1, TC5
- B. TC3, TC5, TC6, TC1, TC4, TC3
- C. TC4, TC6, TC3, TC2, TC5, TC1
- D. TC4, TC3, TC2, TC6, TC5. TC1
Answer: A
Explanation:
This answer is correct because it follows the logical dependencies and allows executing the test cases in priority order. TC4, TC3, and TC2 are executed first because they have the highest priority. TC6 is executed next because it has a logical dependency on TC2. TC1 is executed next because it has a logical dependency on TC5. Finally, TC5 is executed last because it has the lowest priority. Reference: ISTQB Certified Tester Foundation Level (CTFL) v4.0 documents
NEW QUESTION # 23
In a two-hour uninterrupted test session, performed as part of an iteration on an Agile project, a heuristic checklist was used to help the tester focus on some specific usability issues of a web application.
The unscripted tests produced by the tester's experience during such session belong to which one of the following testing quadrants?
- A. Q2
- B. Q1
- C. Q3
- D. Q4
Answer: C
Explanation:
Explanation
The unscripted tests produced by the tester's experience during the two-hour test session belong to the testing quadrant Q3. The testing quadrants are a classification of testing types based on two dimensions: the test objectives (whether the testing is focused on supporting the team or critiquing the product) and the test basis (whether the testing is based on the technology or the business). The testing quadrants are labeled as Q1, Q2, Q3, and Q4, and each quadrant represents a different testing perspective, such as unit testing, acceptance testing, usability testing, or performance testing. The testing quadrant Q3 corresponds to the testing types that have the objective of critiquing the product from the business perspective, such as exploratory testing, usability testing, user acceptance testing, alpha testing, beta testing, etc. The unscripted tests performed by the tester in the given scenario are examples of exploratory testing and usability testing, as they are based on the tester's experience, intuition, and learning of the web application, and they focus on some specific usabilityissues, such as the user interface, the user satisfaction, the user feedback, etc. The other options are incorrect, because:
The testing quadrant Q1 corresponds to the testing types that have the objective of supporting the team from the technology perspective, such as unit testing, component testing, integration testing, system testing, etc. These testing types are usually performed by developers or testers who have access to the source code, the design, the architecture, or the configuration of the software system, and they aim to verify the functionality, the quality, and the reliability of the software system at different levels of integration.
The testing quadrant Q2 corresponds to the testing types that have the objective of supporting the team from the business perspective, such as functional testing, acceptance testing, story testing, scenario testing, etc. These testing types are usually performed by testers or customers who have access to the requirements, the specifications, the user stories, or the business processes of the software system, and they aim to validate that the software system meets the expectations and the needs of the users and the stakeholders.
The testing quadrant Q4 corresponds to the testing types that have the objective of critiquing the product from the technology perspective, such as performance testing, security testing, reliability testing, compatibility testing, etc. These testing types are usually performed by testers or specialists who have access to the tools, the metrics, the standards, or the benchmarks of the software system, and they aim to evaluate the non-functional aspects of the software system, such as the efficiency, the security, the reliability, or the compatibility of the software system under different conditions or environments.
References: ISTQB Certified Tester Foundation Level (CTFL) v4.0 sources and documents:
ISTQB Certified Tester Foundation Level Syllabus v4.0, Chapter 1.3.1, Testing in Software Development Lifecycles ISTQB Glossary of Testing Terms v4.0, Testing Quadrant, Exploratory Testing, Usability Testing, Unit Testing, Component Testing, Integration Testing, System Testing, Functional Testing, Acceptance Testing, Story Testing, Scenario Testing, Performance Testing, Security Testing, Reliability Testing, Compatibility Testing
NEW QUESTION # 24
Test automation allows you to:
- A. avoid performing exploratory testing
- B. demonstrate the absence of defects
- C. produce tests that are less subject to human errors
- D. increase test process efficiency by facilitating management of defects
Answer: C
Explanation:
Test automation allows you to produce tests that are less subject to human errors, as they can execute predefined test scripts or test cases with consistent inputs, outputs, and expected results. Test automation can also reduce the manual effort and time required to execute repetitive or tedious tests, such as regression tests, performance tests, or data-driven tests. Test automation does not demonstrate the absence of defects, as it can only verify the expected behavior of the system under test, not the unexpected or unknown behavior. Test automation does not avoid performing exploratory testing, as exploratory testing is a valuable technique to discover new information, risks, or defects that are not covered by automated tests. Test automation does not increase test process efficiency by facilitating management of defects, as defect management is a separate activity that involves reporting, tracking, analyzing, and resolving defects, which may or may not be related to automated tests. Reference: ISTQB Certified Tester Foundation Level (CTFL) v4.0 sources and documents:
ISTQB® Certified Tester Foundation Level Syllabus v4.0, Chapter 3.3.1, Test Automation1 ISTQB® Glossary of Testing Terms v4.0, Test Automation2
NEW QUESTION # 25
Which of the following statements best describes how configuration management supports testing?
- A. Configuration management helps reduce testing effort by identifying a manageable number of test environment configurations in which to test the software, out of all possible configurations of the environment in which the software will be released
- B. Configuration management helps ensure that all relevant project documentation and software items are uniquely identified in all their versions and therefore can be unambiguously referenced in test documentation
- C. Configuration management is an approach to interoperability testing where tests are executed in the cloud, as the cloud can provide cost-effective access to multiple configurations of the test environments
- D. Configuration management is an administrative discipline that includes change control, which is the process of controlling the changes to identified items referred to as Configuration Items'
Answer: B
Explanation:
Explanation
This answer is correct because configuration management is a process of establishing and maintaining consistency of a product's performance, functional, and physical attributes with its requirements, design, and operational information throughout its life. Configuration management helps ensure that all relevant project documentation and software items are uniquely identified in all their versions and therefore can be unambiguously referenced in test documentation. This supports testing by providing traceability, consistency, and control over the test artifacts and the software under test. References: : ISTQB Glossary of Testing Terms v4.0, : ISTQB Foundation Level Syllabus v4.0, Section 2.2.2.2
NEW QUESTION # 26
Which of the following issues cannot be identified by static analysis tools?
- A. Referencing a variable with an undefined value
- B. Security vulnerabilities
- C. Potentially endless loops
- D. Very low MTBF (Mean Time Between failure)
Answer: D
Explanation:
Static analysis tools are software tools that examine the source code of a program without executing it. They can detect various types of issues, such as syntax errors, coding standards violations, security vulnerabilities, and potential bugs12. However, static analysis tools cannot identify issues that depend on the runtime behavior or performance of the program, such as very low MTBF (Mean Time Between failure)3. MTBF is a measure of the reliability of a system or component. It is calculated by dividing the total operating time by the number of failures. MTBF reflects how often a system or component fails during its expected lifetime. Static analysis tools cannot measure MTBF because they do not run the program or observe its failures. MTBF can only be estimated by dynamic testing, which involves executing the program under various conditions and collecting data on its failures4. Therefore, very low MTBF is an issue that cannot be identified by static analysis tools. The other options, such as potentially endless loops, referencing a variable with an undefined value, and security vulnerabilities, are issues that can be identified by static analysis tools. Static analysis tools can detect potentially endless loops by analyzing the control flow and data flow of the program and checking for conditions that may never become false5. Static analysis tools can detect referencing a variable with an undefined value by checking the scope and initialization of variables and reporting any use of uninitialized variables6. Static analysis tools can detect security vulnerabilities by checking for common patterns of insecure code, such as buffer overflows, SQL injections, cross-site scripting, and weak encryption. Reference = What Is Static Analysis? Static Code Analysis Tools - Perforce Software, How Static Code Analysis Works | Perforce, Static Code Analysis: Techniques, Top 5 Benefits & 3 Challenges, What is MTBF? Mean Time Between Failures Explained | Perforce, Static analysis tools - Software Testing MCQs - CareerRide, ISTQB_Chapter3 | Quizizz, [Static Code Analysis for Security Vulnerabilities | Perforce].
NEW QUESTION # 27
Which of the following is a test-first approach, where tests that express a shared understanding from stakeholders of how the application is expected to work, are first written in business-readable language (following the Given/When/Then format), and then made executable to drive development?
- A. Test-Driven Development (TDD)
- B. Domain-Driven Design (DDD)
- C. Behavior-Driven Development (BDD)
- D. Acceptance Test-Driven Development (ATDD)
Answer: C
Explanation:
This answer is correct because Behavior-Driven Development (BDD) is a test-first approach, where tests that express a shared understanding from stakeholders of how the application is expected to work, are first written in business-readable language (following the Given/When/Then format), and then made executable to drive development. BDD is a collaborative approach that involves testers, developers, business analysts, product owners, and other stakeholders in defining the expected behavior of the application using scenarios that describe the preconditions, actions, and outcomes of the application. BDD scenarios are written using a domain-specific language (DSL) that can be translated into executable test cases using tools such as Cucumber or SpecFlow. BDD aims to improve communication, collaboration, and feedback among the team members, and to deliver software that meets the customer's needs and expectations. Reference: ISTQB Glossary of Testing Terms v4.0, ISTQB Foundation Level Syllabus v4.0, Section 3.1.1.4
NEW QUESTION # 28
Which of the following statements is true?
- A. A defect does not always produce a failure, while a bug always produces a failure
- B. Bugs are defects found during component testing, while failures are defects found at higher test levels
- C. A defect may cause a failure which, when occurring, always causes an error
- D. Failures can be caused by defects, but also by environmental conditions
Answer: D
Explanation:
Explanation
Failures can be caused by defects, but also by environmental conditions. A failure is an event in which the software system does not perform a required function or performs a function incorrectly, according to the expected behavior. A defect is a flaw in the software system or a deviation from the requirements or the specifications, that may cause a failure. However, not all failures are caused by defects, as some failures may be caused by environmental conditions, such as hardware malfunctions, network interruptions, power outages, incompatible configurations, etc. Environmental conditions are factors that affect the operation of the software system, but are not part of the software system itself. The other statements are false, because:
A defect does not always produce a failure, while a bug always produces a failure. This statement is false, because a defect may or may not produce a failure, depending on the inputs, the outputs, the states, or the scenarios of the software system, and a bug is just another term for a defect, so it has the same possibility of producing a failure as a defect. For example, a defect in a rarely used feature or a hidden branch of the code may never produce a failure, while a defect in a frequently used feature or a critical path of the code may produce a failure often. A bug is not a different concept from a defect, but rather a synonymor a colloquial term for a defect, so it has the same definition and implications as a defect.
A defect may cause a failure which, when occurring, always causes an error. This statement is false, because an error is not a consequence of a failure, but rather a cause of a defect. An error is a human action or a mistake that produces a defect in the software system, such as a typo, a logic flaw, a requirement misunderstanding, etc. An error is not observable in the software system, but rather in the human mind or the human work products, such as the code, the design, the documentation, etc. A failure is not a cause of an error, but rather a result of a defect, which is a result of an error. For example, an error in the code may cause a defect in the software system, which may cause a failure in the software behavior.
Bugs are defects found during component testing, while failures are defects found at higher test levels.
This statement is false, because bugs and failures are not different types of defects, but rather different terms for defects and their manifestations. As mentioned before, bugs are just another word for defects, and failures are the events in which the software system does not perform as expected due to defects.
Bugs and failures can be found at any test level, not only at component testing or higher test levels. Test levels are the stages of testing that correspond to the levels of integration of the software system, such as component testing, integration testing, system testing, and acceptance testing. Defects and failures can occur and be detected at any test level, depending on the test objectives, the test basis, the test techniques, and the test environment. References: ISTQB Certified Tester Foundation Level (CTFL) v4.0 sources and documents:
ISTQB Certified Tester Foundation Level Syllabus v4.0, Chapter 1.1.2, Testing and Quality1 ISTQB Certified Tester Foundation Level Syllabus v4.0, Chapter 1.2.1, Testing Principles1 ISTQB Certified Tester Foundation Level Syllabus v4.0, Chapter 1.3.1, Testing in Software Development Lifecycles1 ISTQB Glossary of Testing Terms v4.0, Failure, Defect, Bug, Environmental Condition, Error, Test Level2
NEW QUESTION # 29
The following rules determine the annual bonus to be paid to a salesman of a company based on the total annual amount of the sales made (referred to as TAS).
If the TAS is between 50k€ and 80k€, the bonus is 10%. If the TAS exceeds 80k€ by a value not greater than 40k€, the bonus is 15%. Finally, if the TAS exceeds the maximum threshold which entitles to a 15% bonus, the bonus is 22%.
Consider applying equivalence partitioning to the TAS (Note: 1k€ = 1000 euros).
Which one of the following answers contain only test cases that belong to the same equivalence partition?
- A. TC1 = 40k€; TC2= 46k€; TC3=51k€; TC4=53k€
- B. TC1 = 90k€; TC2= 110k€; TC3=125k€: TC4=140k€
- C. TC1 = 81 k€; TC2= 97k€; TC3=111k€; TC4=118k€
- D. TC1 = 79k€; TC2= 80k€; TC3=81k€; TC4=82k€
Answer: C
Explanation:
This answer is correct because equivalence partitioning is a test design technique that divides the input domain of a system or component into partitions of equivalent data, such that each partition is expected to produce the same output or behavior. Equivalence partitioning aims to reduce the number of test cases by selecting one representative value from each partition. In this case, the input domain of the TAS can be divided into four partitions based on the bonus rules: less than 50k€, between 50k€ and 80k€, between 80k€ and 120k€, and more than 120k€. The test cases in the answer belong to the same partition, which is between 80k€ and 120k€, and they are expected to produce the same output, which is a bonus of 15%. Reference: ISTQB Glossary of Testing Terms v4.0, ISTQB Foundation Level Syllabus v4.0, Section 2.3.2.1
NEW QUESTION # 30
Consider the following user story about the authentication functionality of an e-commerce website:
"As a logged-in user, I want to change my current password with a new one, so that I can make my account safer".
The following are some of the acceptance criteria defined for the user story:
[a] After the logged-in user has successfully changed his password, an email confirming the change must be sent to him
[b] To successfully change the password, the logged-in user must enter the current password, enter a new valid password, and finally confirm by pressing the 'Change Password' button
[c] To be valid, the new password entered by the logged-in user is not only required to meet the criteria related to the length and type of characters, but must also be different form the last 5 passwords of that user
[d] A dedicated error message must be presented to the logged-in user when he enters a wrong current password
[e] A dedicated error message must be presented to the logged-in user when he enters the correct current password, but enters an invalid password Based only on the given information, which of the following ATDD tests is most likely to be written first?
- A. The logged-in user enters a wrong current password and views the dedicated error message
- B. The logged-in user enters the correct current password, enters an invalid password, and finally views the dedicated error
- C. The logged-in user enters the correct current password, enters a valid new password (different from the last 5 passwords), presses the Change Password' button, and finally receives the e-mail confirming that the password has been successfully changed
- D. The logged-in user submits a purchase order containing ten items, selects to pay with a Visa credit card, enters credit card information of a valid card, presses the 'Confirm' button, and finally views the dedicated message confirming that the purchase has been successful
Answer: C
Explanation:
ATDD stands for Acceptance Test-Driven Development, which is a collaborative approach to software development and testing, in which the acceptance criteria of a user story are defined and automated as executable tests before the implementation of the software system. ATDD tests are usually written in a Given-When-Then format, which describes the preconditions, the actions, and the expected outcomes of a test scenario. ATDD tests are intended to verify that the software system meets the expectations and the needs of the users and the stakeholders, as well as to provide feedback and guidance for the developers and the testers. Based on the given information, the ATDD test that is most likely to be written first is the one that corresponds to option B, which is:
Given the logged-in user is on the Change Password page When the user enters the correct current password, enters a valid new password (different from the last 5 passwords), and presses the Change Password button Then the user receives an email confirming that the password has been successfully changed This ATDD test is most likely to be written first, because it covers the main functionality and the happy path of the user story, as well as the most important acceptance criterion [a]. It also verifies that the user can change the password with a valid new password that meets the criteria related to the length, the type of characters, and the history of the passwords, as specified in the acceptance criterion [c]. The other options are not likely to be written first, because they either cover less critical or less frequent scenarios, such as entering a wrong current password [d] or an invalid new password [e], or they are not related to the user story or the acceptance criteria at all, such as submitting a purchase order [d]. Reference: ISTQB Certified Tester Foundation Level (CTFL) v4.0 sources and documents:
ISTQB® Certified Tester Foundation Level Syllabus v4.0, Chapter 1.3.1, Testing in Software Development Lifecycles1 ISTQB® Glossary of Testing Terms v4.0, Acceptance Test-Driven Development, User Story, Acceptance Criterion, Given-When-Then2
NEW QUESTION # 31
Which of the following is a test-first approach, where tests that express a shared understanding from stakeholders of how the application is expected to work, are first written in business-readable language (following the Given/When/Then format), and then made executable to drive development?
- A. Test-Driven Development (TDD)
- B. Domain-Driven Design (DDD)
- C. Behavior-Driven Development (BDD)
- D. Acceptance Test-Driven Development (ATDD)
Answer: C
Explanation:
Explanation
This answer is correct because Behavior-Driven Development (BDD) is a test-first approach, where tests that express a shared understanding from stakeholders of how the application is expected to work, are first written in business-readable language (following the Given/When/Then format), and then made executable to drive development. BDD is a collaborative approach that involves testers, developers, business analysts, product owners, and other stakeholders in defining the expected behavior of the application using scenarios that describe the preconditions, actions, and outcomes of the application. BDD scenarios are written using a domain-specific language (DSL) that can be translated into executable test cases using tools such as Cucumber or SpecFlow. BDD aims to improve communication, collaboration, and feedback among the team members, and to deliver software that meets the customer's needsand expectations. References: ISTQB Glossary of Testing Terms v4.0, ISTQB Foundation Level Syllabus v4.0, Section 3.1.1.4
NEW QUESTION # 32
The acceptance criteria associated with a user story:
- A. are often documented following in rule-oriented format using the following template: "As a [role], I want [feature], so that I can [benefit]"
- B. can be written in different formats and represent an aspect of a user story referred to as confirmation' of the so called "3 C's"
- C. must be written in one of the two following formats: scenario-oriented or rule-oriented
- D. are often written in a rule-oriented format using the template referred to as "Given/When/Then"
Answer: B
Explanation:
The acceptance criteria associated with a user story are the conditions that must be met for the user story to be considered done and to deliver the expected value to the user. They are often written in different formats, such as rule-oriented, scenario-oriented, or table-oriented, depending on the nature and complexity of the user story. They represent an aspect of a user story referred to as confirmation, which is one of the so called "3 C's" of user stories. The other two aspects are card and conversation. Card refers to the concise and informal description of the user story, usually following the template: "As a [role], I want [feature], so that I can [benefit]". Conversation refers to the ongoing dialogue between the stakeholders and the team members to clarify and refine the user story and its acceptance criteria. Therefore, option C is the correct answer.
NEW QUESTION # 33
Which of the following is a task the Author is responsible for, as part of a typical formal review?
- A. Determining the people who will be involved in the review
- B. Identifying potential anomalies in the work product under review
- C. Recording the anomalies found during the review meeting
- D. Fixing the anomalies found in the work product under review
Answer: B
Explanation:
Explanation
This answer is correct because identifying potential anomalies in the work product under review is one of the tasks the Author is responsible for, as part of a typical formal review. The Author is the person who creates the work product to be reviewed, such as a requirement specification, a design document, or a test case. The Author's tasks include preparing the work product for the review, identifying potential anomalies in the work product, and fixing the anomalies found in the work product after the review. References: ISTQB Glossary of Testing Terms v4.0, ISTQB Foundation Level Syllabus v4.0, Section 2.4.2.1
NEW QUESTION # 34
Which of the following applications will be the MOST suitable for testing by Use Cases
- A. The ability of an Anti virus package to detect and quarantine a new threat
- B. A billing system used to calculate monthly charge based or large number of subscribers parameters
- C. Accuracy and usability of a new Navigation system compared with previous system
- D. Suitability and performance of a Multi media (audio video based) system to a new operating system
Answer: C
Explanation:
A new navigation system compared with a previous system is the most suitable application for testing by use cases, because it involves a high level of interaction between the user and the system, and the expected behavior and outcomes of the system are based on the user's needs and goals. Use cases can help to specify the functional requirements of the new navigation system, such as the ability to enter a destination, select a route, follow the directions, receive alerts, etc. Use cases can also help to compare the accuracy and usability of the new system with the previous system, by defining the success and failure scenarios, the preconditions and postconditions, and the alternative flows of each use case. Use cases can also help to design and execute test cases that cover the main and exceptional paths of each use case, and to verify the satisfaction of the user's expectations.
The other options are not the most suitable applications for testing by use cases, because they do not involve a high level of interaction between the user and the system, or the expected behavior and outcomes of the system are not based on the user's needs and goals. A billing system used to calculate monthly charge based on a large number of subscriber parameters is more suitable for testing by data-driven testing, which is a technique for testing the functionality and performance of a system or component by using a large set of input and output data. The ability of an antivirus package to detect and quarantine a new threat is more suitable for testing by exploratory testing, which is a technique for testing the functionality and security of a system or component by using an informal and flexible approach, based on the tester's experience and intuition. The suitability and performance of a multimedia (audio video based) system to a new operating system is more suitable for testing by compatibility testing, which is a technique for testing the functionality and performance of a system or component by using different hardware, software, or network environments. Reference = CTFL 4.0 Syllabus, Section 3.1.1, page 28-29; Section 4.1.1, page 44-45; Section 4.2.1, page 47-48.
NEW QUESTION # 35
Which of the following statements refers to good testing practice to be applied regardless of the chosen software development model?
- A. Test objectives should be the same for all test levels, although the number of tests designed at various levels can vary significantly
- B. Tests should be written in executable format before the code is written and should act as executable specifications that drive coding
- C. Test levels should be defined such that the exit criteria of one level are part of the entry criteria for the next level
- D. Involvement of testers in work product reviews should occur as early as possible to take advantage of the early testing principle
Answer: D
Explanation:
The statement that refers to good testing practice to be applied regardless of the chosen software development model is option D, which says that involvement of testers in work product reviews should occur as early as possible to take advantage of the early testing principle. Work product reviews are static testing techniques, in which the work products of the software development process, such as the requirements, the design, the code, the test cases, etc., are examined by one or more reviewers, with or without the author, to identify defects, violations, or improvements. Involvement of testers in work product reviews can provide various benefits for the testing process, such as improving the test quality, the test efficiency, and the test communication. The early testing principle states that testing activities should start as early as possible in the software development lifecycle, and should be performed iteratively and continuously throughout the lifecycle. Applying the early testing principle can help to prevent, detect, and remove defects at an early stage, when they are easier, cheaper, and faster to fix, as well as to reduce the risk, the cost, and the time of the testing process. The other options are not good testing practices to be applied regardless of the chosen software development model, but rather specific testing practices that may or may not be applicable or beneficial for testing, depending on the context and the objectives of the testing activities, such as:
Tests should be written in executable format before the code is written and should act as executable specifications that drive coding: This is a specific testing practice that is associated with test-driven development, which is an approach to software development and testing, in which the developers write automated unit tests before writing the source code, and then refactor the code until the tests pass. Test-driven development can help to improve the quality, the design, and the maintainability of the code, as well as to provide fast feedback and guidance for the developers. However, test-driven development is not a good testing practice to be applied regardless of the chosen software development model, as it may not be feasible, suitable, or effective for testing in some contexts or situations, such as when the requirements are unclear, unstable, or complex, when the test automation tools or skills are not available or adequate, when the testing objectives or levels are not aligned with the unit testing, etc.
Test levels should be defined such that the exit criteria of one level are part of the entry criteria for the next level: This is a specific testing practice that is associated with sequential software development models, such as the waterfall model, the V-model, or the W-model, in which the software development and testing activities are performed in a linear and sequential order, with well-defined phases, deliverables, and dependencies. Test levels are the stages of testing that correspond to the levels of integration of the software system, such as component testing, integration testing, system testing, and acceptance testing. Test levels should have clear and measurable entry criteria and exit criteria, which are the conditions that must be met before starting or finishing a test level. In sequential software development models, the exit criteria of one test level are usually part of the entry criteria for the next test level, to ensure that the software system is ready and stable for the next level of testing. However, this is not a good testing practice to be applied regardless of the chosen software development model, as it may not be relevant, flexible, or efficient for testing in some contexts or situations, such as when the software development and testing activities are performed in an iterative and incremental order, with frequent changes, feedback, and adaptations, as in agile software development models, such as Scrum, Kanban, or XP, when the test levels are not clearly defined or distinguished, or when the test levels are performed in parallel or concurrently, etc.
Test objectives should be the same for all test levels, although the number of tests designed at various levels can vary significantly: This is a specific testing practice that is associated with uniform software development models, such as the spiral model, the incremental model, or the prototyping model, in which the software development and testing activities are performed in a cyclical and repetitive manner, with similar phases, deliverables, and processes. Test objectives are the goals or the purposes of testing, which can vary depending on the test level, the test type, the test technique, the test environment, the test stakeholder, etc. Test objectives can be defined in terms of the test basis, the test coverage, the test quality, the test risk, the test cost, the test time, etc. Test objectives should be specific, measurable, achievable, relevant, and time-bound, and they should be aligned with the project objectives and the quality characteristics. In uniform software development models, the test objectives may be the same for all test levels, as the testing process is repeated for each cycle or iteration, with similar focus, scope, and perspective of testing. However, this is not a good testing practice to be applied regardless of the chosen software development model, as it may not be appropriate, realistic, or effective for testing in some contexts or situations, such as when the software development and testing activities are performed in a hierarchical and modular manner, with different phases, deliverables, and dependencies, as in sequential software development models, such as the waterfall model, the V-model, or the W-model, when the test objectives vary according to the test levels, such as component testing, integration testing, system testing, and acceptance testing, or when the test objectives change according to the feedback, the learning, or the adaptation of the testing process, as in agile software development models, such as Scrum, Kanban, or XP, etc. Reference: ISTQB Certified Tester Foundation Level (CTFL) v4.0 sources and documents:
ISTQB® Certified Tester Foundation Level Syllabus v4.0, Chapter 1.1.1, Testing and the Software Development Lifecycle1 ISTQB® Certified Tester Foundation Level Syllabus v4.0, Chapter 1.2.1, Testing Principles1 ISTQB® Certified Tester Foundation Level Syllabus v4.0, Chapter 1.2.2, Testing Policies, Strategies, and Test Approaches1 ISTQB® Certified Tester Foundation Level Syllabus v4.0, Chapter 1.3.1, Testing in Software Development Lifecycles1 ISTQB® Certified Tester Foundation Level Syllabus v4.0, Chapter 2.1.1, Test Planning1 ISTQB® Certified Tester Foundation Level Syllabus v4.0, Chapter 2.1.2, Test Monitoring and Control1 ISTQB® Certified Tester Foundation Level Syllabus v4.0, Chapter 2.1.3, Test Analysis and Design1 ISTQB® Certified Tester Foundation Level Syllabus v4.0, Chapter 2.1.4, Test Implementation1 ISTQB® Certified Tester Foundation Level Syllabus v4.0, Chapter 2.1.5, Test Execution1 ISTQB® Certified Tester Foundation Level Syllabus v4.0, Chapter 2.1.6, Test Closure1 ISTQB® Glossary of Testing Terms v4.0, Work Product Review, Static Testing, Early Testing, Test-driven Development, Test Level, Entry Criterion, Exit Criterion, Test Objective, Test Basis, Test Coverage, Test Quality, Test Risk, Test Cost, Test Time2
NEW QUESTION # 36
Which of the following statements is true?
- A. Experience-based test techniques rely on the experience of testers to identify the root causes of defects found by black-box test techniques
- B. Some of the most common test basis used by white-box test techniques include user stories, use cases and business processes
- C. Experience-based test techniques are often useful to detect hidden defects that have not been targeted by black-box test techniques
- D. The primary goal of experience-based test techniques is to design test cases that can be easily automated using a GUI-based test automation tool
Answer: C
Explanation:
Explanation
Experience-based test techniques are test design techniques that rely on the experience, knowledge, intuition, and creativity of the testers to identify and execute test cases that are likely to find defects in the software system. Experience-based test techniques are often useful to detect hidden defects that have not been targeted by black-box test techniques, which are test design techniques that use the external behavior and specifications of the software system as the test basis, without considering its internal structure or implementation.
Experience-based test techniques can complement black-box test techniques by covering aspects that are not explicitly specified, such as usability, security, reliability, performance, etc. The other statements are false, because:
Experience-based test techniques do not rely on the experience of testers to identify the root causes of defects found by black-box test techniques, but rather to identify the potential sources of defects based on their own insights, heuristics, or exploratory testing. The root causes of defects are usually identified by debugging or root cause analysis, which are activities that involve examining the code or the development process to find and fix the errors that led to the defects.
Some of the most common test basis used by white-box test techniques include the source code, the design documents, the architecture diagrams, and the control flow graphs of the software system.
White-box test techniques are test design techniques that use the internal structure and implementation of the software system as the test basis, and aim to achieve a certain level of test coverage based on the code elements, such as statements, branches, paths, etc. User stories, use cases, and business processes are examples of test basis used by black-box test techniques, as they describe the functional and non-functional requirements of the software system from the perspective of the users or the stakeholders.
The primary goal of experience-based test techniques is not to design test cases that can be easily automated using a GUI-based test automation tool, but rather to design test cases that can reveal defects that are not easily detected by other test techniques, such as boundary value analysis, equivalence partitioning, state transition testing, etc. Test automation is the use of software tools to execute test cases and compare actual results with expected results, without human intervention. Test automation can be applied to different types of test techniques, depending on the test objectives, the test levels, the test tools, and the test resources. However, test automation is not always feasible or beneficial, especially for test cases that require human judgment, creativity, or exploration, such as those designed by experience-based test techniques. References: ISTQB Certified Tester Foundation Level (CTFL) v4.0 sources and documents:
ISTQB Certified Tester Foundation Level Syllabus v4.0, Chapter 2.2.1, Black-box Test Design Techniques ISTQB Certified Tester Foundation Level Syllabus v4.0, Chapter 2.2.2, White-box Test Design Techniques ISTQB Certified Tester Foundation Level Syllabus v4.0, Chapter 2.2.3, Experience-based Test Design Techniques ISTQB Glossary of Testing Terms v4.0, Experience-based Test Technique, Black-box Test Technique, White-box Test Technique, Test Basis, Test Coverage, Test Automation
NEW QUESTION # 37
......
Latest 100% Passing Guarantee - Brilliant CTFL_Syll_4.0 Exam Questions PDF: https://www.practicevce.com/ISQI/CTFL_Syll_4.0-practice-exam-dumps.html
CTFL_Syll_4.0 Certification – Valid Exam Dumps Questions Study Guide: https://drive.google.com/open?id=1FZdC2748pMw68YFe4PAsoZUlIY27Y0LS