
Free C_TS422_1909 braindumps download (C_TS422_1909 exam dumps Free Updated Oct 21, 2021)
C_TS422_1909 Dumps for Pass Guaranteed - Pass C_TS422_1909 Exam 2021
SAP C_TS422_1909 Certification Exam Topics:
| Topic Areas | Topic Details, Courses, Books |
|---|---|
| Lean Manufacturing in SAP S/4HANA 8% - 12% | Identify repetitive manufacturing specific master data, explain line load planning and confirmation, outline Kanban master data and Kanban processes. |
| Capacity Planning in SAP S/4HANA 8% - 12% | Outline best practices for using SAP S/4HANA, describe the SAP HANA database concept and new user experience with SAP Fiori, outline the capabilities of embedded analytics. |
| Production Orders in SAP S/4HANA > 12% | Determine BOM item category, describe order status management and set user statuses, configure availability check for components, trigger routing selection, set up an order type, apply material staging and confirmation. |
| Material Requirements Planning in SAP S/4HANA 8% - 12% | Select and apply planning strategies, use the planning table, characterize long-term planning and master production scheduling, outline MRP basics and steps of MRP, and describe lot size procedures. |
| Process Orders in SAP S/4HANA < 8% | Characterize process order elements and process order processing, determine master data objects for process orders, identify features for Good Manufacturing Practices (GMP). |
| Master Data in SAP S/4HANA > 12% | Identify and explain production relevant master data, including, but not limited to: bill of material, routing and production version. |
| Demand Management in SAP S/4HANA < 8% | Explain and compare the different production methods in make-to-order, make-to-stock, and assembly planning. |
| Introduction to SAP S/4HANA Production Planning < 8% | Outline production planning components and functions, differentiate consumption-based planning vs. MRP, outline new trends in production planning. |
| Introduction to SAP S/4HANA Supply Chain Planning < 8% | Outline both motivation and background of SAP S/4HANA, describe its main components, the lines of business, and the SAP User Experience strategy. |
| Advanced Planning in SAP S/4HANA > 12% | Outline the basics and master data of advanced planning, explain tools (alert monitor, detailed scheduling planning board) and advanced planning and detailed scheduling processes, explain planning evaluation concepts |
C_TS422_1909 Exam Certification Details:
| Exam: | 80 questions |
| Level: | Associate |
| Duration: | 180 mins |
| Sample Questions: | SAP C_TS422_1909 Exam Sample Question |
| Languages: | German, English, French, Chinese |
| Cut Score: | 55% |
SAP C_TS422_1909 Exam Description:
The "SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing" certification exam validates that the candidate possesses the fundamental and core knowledge required of the SAP S/4HANA Manufacturing consultant profile. This certification proves that the candidate has an overall understanding and in‐depth technical skills to participate as a member of a project team in a mentored role.
NEW QUESTION 49
You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of material shortage. What must you do? Note: There are 2 correct answers to this question.
- A. Set the creation indicator for purchase requisitions on the initial screen of the MRP run.
- B. Add the agreement to the source list and mark it for MRP relevance.
- C. Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.
- D. Add the agreement to the quota arrangement and mark it for MRP relevance.
Answer: B,C
NEW QUESTION 50
You want to create a production order from a planned order. What methods could you use? Note: There are 2 correct answers to this question.
- A. Full conversion
- B. Partial conversion
- C. Individual conversion
- D. Order release
Answer: A,B
NEW QUESTION 51
How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.
- A. Adjust the available capacity.
- B. Select an alternative mode on a resource.
- C. Form optimum sequences to reduce setup times.
- D. Execute a new production planning run.
- E. Reduce the planning window.
Answer: A,B,C
NEW QUESTION 52
The settings for MRP can be maintained at different levels. If settings have been maintained in different places, in which sequence does the system search for the MRP settings?
Please choose the correct answer.
Response:
- A. Material Master -> Plant Settings -> MRP Group
- B. MRP Group -> Material Master -> Plant Settings
- C. Plant Settings -> MRP Group -> Material Master
- D. Material Master -> MRP Group -> Plant Settings
Answer: D
NEW QUESTION 53
You want to procure your material components based on a forecast for the finished material derived from historical sales. When customers order, you produce the finished product and reserve it for that particular order.
Which is the appropriate planning strategy to use?
Please choose the correct answer.
Response:
- A. Make-to-order production (20)
- B. Planning with final assembly (40)
- C. Production by lot size (30)
- D. Planning without final assembly (50)
Answer: D
NEW QUESTION 54
When the goods receipt for a finished product is posted during confirmation on a manufacturing environment, which of the following actions are also performed by default?
There are 2 correct answers to this question.
Response:
- A. Reduction of the capacity requirements
- B. Archiving of backflush documents
- C. Posting of production costs to cost collector
- D. Staging of components for the next order in the sequence
Answer: B,C
NEW QUESTION 55
Which of the following are included as SAP S/4HANA Sales Simplifications?
There are 3 correct answers to this question.
Response:
- A. SAP order Fulfillment replaces ERP SD Availability Checking
- B. SAP Sales Support replaces SAP CRM
- C. SAP Revenue Accounting replaces ERP SD Revenue Recognition
- D. SAP GTS replaces ERP SD Foreign Trade
- E. Settlement Management replaces ERP SD Rebates
Answer: C,D,E
NEW QUESTION 56
Which SAP solutions can be used for forecast ng in Supply Chain Planning? Note: There are 2 correct answers to this question.
- A. Material Requirements Planning (MRP)
- B. Integrated Business Planning (IBP)
- C. Supply Chain Management (SCM)
- D. Capacity Requirements Planning (CRP)
Answer: B,C
NEW QUESTION 57
Which of the following processes lead to an entry in the MRP planning file? Note: There are 3 correct answers to this question.
- A. Change of the material's procurement type
- B. Creation of a purchasing contract
- C. Creation of dependent requirements
- D. Change of the storage bin
- E. Creation of a sales order
Answer: A,C,E
NEW QUESTION 58
What new technology is used in SAP S/4HANA Embedded Analytics?
Please choose the correct answer.
Response:
- A. Smart Business Cockpit
- B. ABAP Managed Core Data Services (CDS)
- C. Multidimensional Reporting client (MDRC)
- D. HANA Live
Answer: B
NEW QUESTION 59
Which of the following business processes are controlled by parameters that are dependent on production order type? Note: There are 2 correct answers to this question.
- A. Engineering change management
- B. Planning
- C. Inspection during production
- D. Implementation
Answer: B,D
NEW QUESTION 60
What are main innovations in manufacturing in SAP S/4HANA?
There are 3 correct answers to this question.
Response:
- A. Flow manufacturing
- B. Monitor Production Orders Fiori app
- C. Lock-free inventory movements
- D. Material Coverage Fiori app
- E. Rough-cut capacity planning
Answer: B,C,D
NEW QUESTION 61
What data can you maintain in the sub items of a bill of material (BOM)? Note: There are 2 correct answers to this question.
- A. Item type
- B. Quantity
- C. Installation point
- D. Scrap percentage
Answer: B,C
NEW QUESTION 62
Which task list types can have parallel sequences?
There are 2 correct answers to this question.
Response:
- A. Master recipes (2)
- B. Reference operation sets (S)
- C. Rate routings (R)
- D. Routings (N)
Answer: C,D
NEW QUESTION 63
Which chart types does the tabular planning table provide in SAP S/4HANA? Note: There are 2 correct answers to this question.
- A. Orders (dispatched) chart
- B. Capacity requirements chart
- C. Work center capacities chart
- D. Order (pool) chart
Answer: B,C
NEW QUESTION 64
How does the new Inventory Management Data model contribute to the reduction of the data footprint?
There are 3 correct answers to this question.
Response:
- A. By eliminating inventory tables
- B. By eliminating fields for different stock types
- C. By eliminating material master tables
- D. By eliminating hybrid tables
- E. By eliminating inventory history tables
Answer: A,B,E
NEW QUESTION 65
For which data objects do you have to set up CIF integration models in S/4HANA to use them in advanced planning?
There are 2 correct answers to this question.
Response:
- A. Work center
- B. Material master
- C. Contract
- D. Production plant
Answer: C,D
NEW QUESTION 66
What are the consequences if operation status Dispatched is set for a production order operation?
- A. You can reschedule the order using material requirements planning.
- B. You can reschedule the operation using lead the scheduling.
- C. You can reschedule the operation using finite Scheduling in a planning board.
- D. You can reschedule the order using lead time scheduling.
Answer: C
NEW QUESTION 67
Your project uses process orders for the production of liquid chemicals. What can you define to ensure that the production flow happens only in physically connected tanks?
- A. Work center hierarchy
- B. Setup matrix
- C. Operation network
- D. Resource network
Answer: A
NEW QUESTION 68
You are using heuristic SAP_ERP_001. Which of the following criteria are included in the automatic source determination logic when a planned order is created?
Please choose the correct answer.
Response:
- A. Quota arrangement
- B. Costs
- C. Delivery date
- D. Component availability
- E. Vendor rating
Answer: A
NEW QUESTION 69
What do you use to schedule operations from planned orders so that the production plan can be fulfilled?
- A. Material Requirements Planning (MRP)
- B. Capacity Requirements Planning (CRP)
- C. Demand Planning (DP)
- D. Supply Network Planning (SNP)
Answer: A
NEW QUESTION 70
When would you use reporting point backflush in repetitive manufacturing?
There are 2 correct answers to this question.
Response:
- A. For production lines with short lead times
- B. You require an up-to-date inventory for components
- C. When you need to determine the work in progress
- D. When goods issues can wait for final confirmation
Answer: C,D
NEW QUESTION 71
The setup time on the production line to produce a material is extensive. You would like to avoid multiple setups and limit the production of the material based on a planning calendar.
Which type of lot size procedure should you use to accomplish this?
Please choose the correct answer.
Response:
- A. Periodic lot sizing
- B. Exact lot sizing
- C. Minimum lot sizing
- D. Fixed lot sizing
Answer: A
NEW QUESTION 72
During production order creation, several valid production versions are found. How does the system choose the product conversion?
- A. Lot size or material cost
- B. Planned order or material number
- C. Validity period or sales order
- D. Alphanumeric or quota arrangement
Answer: D
NEW QUESTION 73
......
Verified C_TS422_1909 dumps Q&As - Pass Guarantee Exam Dumps Test Engine: https://www.practicevce.com/SAP/C_TS422_1909-practice-exam-dumps.html