
CTAL-TAE Exam Brain Dumps - Study Notes and Theory [Nov-2021]
100% Guaranteed Results CTAL-TAE Unlimited 41 Questions
ISQI CTAL-TAE Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
| Topic 5 |
|
| Topic 6 |
|
| Topic 7 |
|
| Topic 8 |
|
| Topic 9 |
|
NEW QUESTION 12
Youare using a gTAA to create a TAS for a project. The TAS is aimed specifically at automating a suit of existing manual test cases for standalone desktop applications. All the interfaces between the TAS and SUT will be from the CUI of the application.
Whichof the following layers of the gTAA should you focus on for the TAS?
- A. The Test Definition layer
- B. The Test Adaption layer
- C. The Test Execution layer
- D. The test Generation layer
Answer: B
NEW QUESTION 13
You are executing the first test run of a test automation suite of 200 tests. All the relevant information related to the state of the SUT and to the automated test execution is stored in a small database. During the Automated test run you observe that the first 10 test pass, while an abnormal termination occurs when executing the
11thtest. This test does not complete its execution and the overall execution of the suite is aborted. An immediate analysis of the abnormal termination is expected to be time consuming and you have been asked to produce a detailed report of the execution results for the first test run, as soon as possible.
What is the MOST important FIRST step to be taken immediately after the abnormal occurred when executing the 11thtest?
- A. Take a backup of the database in its current state. So It can be analyzed later
- B. Re-run the test automation suite starting from the 12thtest
- C. Re-run the test automation suite starting from the 1sttest.
- D. Return the database to a consistent state that allows subsequent test to run
Answer: A
NEW QUESTION 14
Which of the following statements about the reuse of TAS artefacts is TRUE?
- A. To enable reuse of TAS artefacts, a good design for reuse is built into the TAA and to further action are needed during the TAS lifecycle
- B. Reusable TAS artefacts can include components (or parts of components) associated with different layers of the TAA
- C. Communications maintenance and improvements for reusing TAS artefacts are modifyaddressed during the design of the TAA
- D. Reusable TAS artifacts associated with the definition layer of the TAA include the adaptors to the SUT components and/or interfaces
Answer: A
NEW QUESTION 15
Designing the System Under Test (SUT) for testability is important for a good test automation approach and can also benefit manual test execution.
Which of the following is NOT a consideration when designing for testability?
- A. Observability: The SUT needs to provide interface that give insight into the system.
- B. Clearly defined architecture: The SUT Architecture needs to provide clear and understandable interfaces giving control and visibility on all test levels.
- C. Control: the SUT needs to provide interfaces that can be used to perform actions on SUT.
- D. Re-useability: The code written for the SUT must be re-useable for other similar system.
Answer: A
NEW QUESTION 16
Consider a TAS that exclusively uses the APIs of a SUT. To make this work, significant changes have been required to the SUT by adding a set of dedicated test interfaces to the APIs. All the automated tests will use these test interfaces when interacting with the SUT. Assume that you are currently verifying the correctness of the automated test environment and test tool setup.
Which of the following would you expect to be the MOST specific risk associated with this scenario?
- A. The connectivityfrom the TAS to the dedicated test interfaces will not work
- B. The automated test cases will not contain the expected result
- C. False alarms, that are unlikely to occur inthe real world, will be observed during testing
- D. The process of configuring the TAS will be error-phone due to manual intervention
Answer: C
NEW QUESTION 17
Consider the following layers of the gTAA structure:
a.Test generation layer
b.Test definition layer
c.Test execution layer
d.Test execution layer
Consider the following capabilities associated with these layers.
Acquire all the necessary resources before each test and release all after run, in order to avoid interdependences between test Allow the automated test scripts on an abstract level to interact with components, configurations and interfaces of the SUT.
Design test directives that allow configuring the algorithms used to automatically produce the test cases a given model of the SUT.
Allow the definition and implementation of test cases and data by means of templates and/or guidelines.
Which of the following BEST matches each layer with the appropriate capability?
- A. a-4, b-3, c-1, d-2
- B. a-3, b-4, c-2, d-1
- C. a-4, b-3, c-2, d-1
- D. a-3, b-4, c-1, d-2
Answer: C
NEW QUESTION 18
Designing the System Under Test (SUT) for testability is important for a good test automation approach and can also benefit manual test execution.
Which of the following is NOT a consideration when designing for testability?
- A. Observability: The SUT needs to provide interface that give insight into the system.
- B. Re-useability: The code written for the SUT must be re-useable for other similar system.
- C. Clearly defined architecture: The SUT Architecture needs to provide clear and understandable interfaces giving control and visibility on all test levels.
- D. Control: the SUT needs to provide interfaces that can be used to perform actions on SUT.
Answer: B
NEW QUESTION 19
What is NOT a factor in considering when you are asked to ensure an effective transition from manual to automated tests?
- A. Complexity to automate the manual test cases
- B. Correctness of test data and test cases
- C. The controllability of the SUT
- D. The look and feel of the SUT
Answer: C
NEW QUESTION 20
Assume that you are the TAE responsible for the correct functioning of a TAS, deployed in a test environment that consists of a few machines running the same version of the operating system. The TAS has been working and stable since its deployment, it has been used to run an automated test suite consisting of many similar automated test. The infrastructure team is planning to update the operating system on these machines by installing a new the service pack for security reasons. Since the vendor of the operating system assurance full backward compatibility, the infrastructure team assurance that there will be no impacts on the functioning of the TAS.
What is the BEST approach to confirm the correct functioning of the TAS in this scenario?
- A. Do not run any tests because you can immediately confirm the correct functioning of the automated test suite
- B. Verify the behavior of the automated tests by running a small tests, then gradually run the remaining tests to confirm the correct functioning of the whole automated test suite.
- C. Verify the behavior of the whole automated test suite by running all the automated tests
- D. Make sure that the infrastructure team has completed installing the service pack on the machines where SUT is running, then run the whole automated test suite to verify itsbehavior
Answer: B
NEW QUESTION 21
Consider a SUT that small run on multiple platform during the execution of automated test runs. In each test run an automated test suite needs to be executed, with the same version of the TAF, against the sameversion of the SUT of each platform. Each platform shall have its own dedicated test environment. Your goal is to implement a process as automated as possible ( i.e with minimal manual intervention) that allows implementing a consistent setup of the TAS across the multiple test environments.
Which two of the following aspects are MOST relevant for achieving your goal in this scenario?
* The configuration of the TAS uses automated installation scripts
* The TAF saves the logs needed to debug errors in XML format
C) Features of the TAF not used by the automated tests have been tested D) All the automated test cases contain the expected results E) The TAS components are under configuration management
- A. B and c
- B. A and e
- C. A and d
- D. B and d
Answer: B
NEW QUESTION 22
Which of the following is NOT a technical design consideration for a TAA?
- A. Data used by the SUT, e.g configuration, users
- B. The number of users for the SUT
- C. Standards and Legal requirements, e.g data privacy
- D. Availability of interfaces for the SUT to be testable
Answer: B
NEW QUESTION 23
You are using a gTAA to create a TAS for a project. The TAS is aimed specifically at automating a suit of existing manual test cases for standalone desktop applications. All the interfaces between the TAS and SUT will be from the CUI of the application.
Which of the following layers of the gTAA should you focus on for the TAS?
- A. The Test Definition layer
- B. The test Generation layer
- C. The Test Adaption layer
- D. The Test Execution layer
Answer: B
NEW QUESTION 24
Which of the following success factors for a test automation project is TRUE?
- A. Automated tests that fail due to changes in the requirements of the SUT should be promptly fixed rather than disabled from the test suite
- B. The test cases to be automated first must always be selected based on the number of times a test will need to be run
- C. The test cases to be automated must have a high dependency on particular data values
- D. Automated tests must be designed to capture only the data that is strictly needed for comparing expected and actual results
Answer: A
NEW QUESTION 25
You identified a suitable project to pilot an automation tool and planned and conduced a pilot. The pilot has been successful and tool Is being deployed within your organization, with a plan to increase tool use by the one project at a time. During this rollout some test processes will be changed slightly to gain additional benefits from using the tool.
In the pilot project, a small set of manual tests were automated for the first time. You are currently monitoring the test automation efficiency and this reveals that the automationregimefor the tests is not yet mature.
Which of the following statements is TRUE?
- A. The approach used for deployed this tool is aligned to the standard success factor for deployment
- B. The test process should be radically changed to gain additional benefits from using the tool.
- C. The pilot project should have been critical so that maximum benefits were delivered
- D. The target defined for the project was inappropriate, because the automationregimeforthe automated tests at the end of the pilot is not yet mature.
Answer: B
NEW QUESTION 26
Consider a TAS deployed into production. The SUT is a web application and the test suite consists of a set of automated regression tests developed via GUI. A keyword-driven framework has been adopted for automating the regression tests. The tests are based on identification at low-levels of the web page components (e.g class indexes, tab sequence indexes and coordinates) in the next planned release the SUT will be subject to significant corrective maintenance (bug-fixes) and evolution (new features) Maintenance costs to update the test scripts should be as low as possible and the scripts must be highly reusable.
Which of the following statements is most likely to be TRUE?
- A. False positive errors are likely to occur when running the automated tests on the new releases without modifying the test
- B. The total execution time of the automated regression test suite will decrease for each planned release.
- C. The keyword-driven framework is not suitable, it would be better to adopt a structured-scripting approach
- D. The keyword-driven framework introduces a level abstraction that is too high and makes it difficult what really happens
Answer: C
NEW QUESTION 27
Which of the following attributes should NOT be included in a test execution report associated with a suite of automated tests?
- A. Defect clusters identified during test execution
- B. System/Application under test and its version
- C. Environment in which the tests have been executed
- D. Summary of the test execution results
Answer: A
NEW QUESTION 28
A SUT has an existing automated test suite.
Which of the following statements relating to the introduction of new features in the SUT is TRUE?
- A. Automated tests are not affected by the introduction of a new feature and running them against the new SUT is a waste of effort
- B. The test automation engineer should work with the business analysts to ensure the new feature is testable
- C. It is generally more difficult to automate test cases for a new feature as the development has not yet started
- D. The introduction of a new feature could require updates or additions to the testware components
Answer: A
NEW QUESTION 29
Consider a SUT that small run on multiple platform during the execution of automated test runs. In each test run an automated test suite needs to be executed, with the same version of the TAF, against the same version of the SUT of each platform. Each platform shall have its own dedicated test environment. Your goal is to implement a process as automated as possible ( i.e with minimal manual intervention) that allows implementing a consistent setup of the TAS across the multiple test environments.
Which two of the following aspects are MOST relevant for achieving your goal in this scenario?
* The configuration of the TAS uses automated installation scripts
* The TAF saves the logs needed to debug errors in XML format
C)Features of the TAF not used by the automated tests have been tested
D)All the automated test cases contain the expected results
E)The TAS components are under configuration management
- A. B and c
- B. A and e
- C. A and d
- D. B and d
Answer: B
NEW QUESTION 30
Consider a TAS associated to dynamically changing software frequent releases. Your goal is to determine the amount of effort required to maintain the automated tests of the regression test suite for each new release of the SUT.
What is the MOST important metric to collect to achieve your goal?
- A. The time it takes to execute all the automated tests, for each new release of the SUT.
- B. The number of automated tests requiring maintenance, for each new release of the SUT.
- C. The code coverage achieved with the automated tests, for each new release of the SUT
- D. The number of automated tests which fail because of a single software defect, for each new release of the SUT
Answer: D
NEW QUESTION 31
You are reviewing the testability of your SUT.
Which of the following BEST refers to the characteristic of OBSERVABILITY?
- A. The ability of the SUTto perform its intended function for a specified period of time
- B. The ability of the SUT to prevent unauthorized access to its components or data.
- C. The abilityto identify states, outputs, intermediate result and error messages in the SUT
- D. The ability to exercise the SUT by entering inputs, triggering events and invoking methods
Answer: C
NEW QUESTION 32
What is NOT a factor in considering when you are asked to ensure an effective transition from manual to automated tests?
- A. Complexity to automate the manual test cases
- B. The look andfeel of the SUT
- C. The controllability of the SUT
- D. Correctness of test data and test cases
Answer: B
NEW QUESTION 33
Which of the following statements BEST describe aspects of the SUT to consider when designing a TAA?
- A. All the interface of the SUT affected by the tests should be controllable by the TAA
- B. All the external test interfaces of the SUT should be removed prior to the product release
- C. All the interaction between SUT and TAS should be logged with the highest level of detail
- D. All the internal test interfaces of the SUT should be removed prior to the product release
Answer: C
NEW QUESTION 34
......
CTAL-TAE Dumps PDF - Want To Pass CTAL-TAE Fast: https://www.practicevce.com/ISQI/CTAL-TAE-practice-exam-dumps.html
CTAL-TAE Practice Exam Dumps Exam: https://drive.google.com/open?id=1cuJFthWAdNYO_tI7NEz7GKom-WWxOF-o