NEW QUESTION 92
Your customer defined one distribution cycle in SAP S/4HANA.
You need to define a new distribution cycle. How can you ensure the new cycle is executed only after the existing one is completed?
- A. Select iteration in the cycle header of the new cycle
- B. Select iteration in the cycle header of both cycles
- C. Assign each cycle to a different cycle run group
- D. Assign both cycles to the same cycle run group
Answer: D
NEW QUESTION 93
What does the calculation of a condition type in the costing sheet depend on? There are 2 correct answers to this question.
- A. Calculation type
- B. Segment
- C. Condition class
- D. Valuation
Answer: A,C
NEW QUESTION 94
Which statement best describes a cost center standard hierarchy?
- A. It represents an organization unit in SAP S/4HANA where the costs and revenues are incurred and reported
- B. It enables you to assign the same attributes to similar cost centers within a controlling area
- C. It is grouped together with alternative hierarchies to represent decision control and repsonsability units
- D. It is a structure to which all the cost centers within a controlling area are assigned
Answer: D
NEW QUESTION 95
What can you configure in the settlement profile? Note: There are 2 correct answers to this question.
- A. Determine an overhead key.
- B. Determine whether settlement is required.
- C. Define a number range for settlement document.
- D. Define document management parameters.
Answer: B,D
NEW QUESTION 96
Where do you activate commitment management for internal orders? There are TWO correct answers for this question
- A. In the budget profile
- B. In the controlling area
- C. In the company code
- D. In the order type
Answer: B,D
NEW QUESTION 97
For which objects can you revaluate activities and business processes at actual prices? There are THREE correct answers for this question
- A. Profitability segments
- B. Cost centers
- C. Work breakdown structure elements
- D. Work centers
- E. Profit centers
Answer: A,C,E
NEW QUESTION 98
You want to understand why costs are collected on sales order item level. What do you need to check in the configuration?
3 answers
- A. Costing type
- B. Requirement class
- C. Valuation variant
- D. Account assignment category
- E. Requirement type
Answer: B,D,E
NEW QUESTION 99
How do you define the relationship between an operating concern and a controlling area ?
- A. One-to-many (1:N)
- B. Many-to-one (N:l)
- C. One-to-one (1:1)
- D. Many-to-many(N:N)
Answer: A
NEW QUESTION 100
Which configuration is possible when you assign multiple company codes to a controlling area in SAP S/4HANA ?
- A. The company code fiscal year variant may differ fro the controlling area fiscal year variant in the number of periods
- B. The company code operational chart of accounts may differ from the controlling area operational chart of accounts
- C. The company code fiscal year variant may differ fro the controlling area fiscal year variant in the number of periods and number of special periods
- D. The company code currency may differ from the controlling area currency
Answer: D
NEW QUESTION 101
In an SAP S/4HANA system, you have two profit centers with the same profit center code and the same validity period, but different names. What does this indicate about the configuration of the profit centers?
- A. They are assigned to different functional areas
- B. They are defined in separate company codes
- C. They are defined in separate controlling areas
- D. They are assigned to different segments
Answer: C
NEW QUESTION 102
You want to setup integrated planning for your internal order. What do you need to do? Note: There are 2 correct answers to this question.
- A. Set the relevant indicator in the controlling area.
- B. Set the relevant indicators in the CO version.
- C. Set the relevant indicator in the internal order master record.
- D. Set the relevant indicator in the planning profile of the order type.
Answer: B,C
NEW QUESTION 103
You want to determine which operations of the routing should be considered in a product cost calculation. How do you do this? Note: There are 2 correct answers to this question.
- A. By marking the Relevance to Costing indicator in the operation
- B. By defining a usage key in the header of the routing.
- C. By marking the cost indicator in the control key assigned to the operation
- D. By assigning a cost center to the work center in the operation
Answer: A,C
NEW QUESTION 104
You have activated budget availability control against the overall value for an internal order and entered an overall budget of 10000.
Actuals of 10000 were posted in the previous year.
You are surprised to realize that a purchase order 1000 was created for this internal order in the current year.
How is that possible?
Note: There are 2 correct answers to this question.
- A. The difference of 1000 is within the tolerance limits defined in the configuration.
- B. The cost element is exempted from budget availability control.
- C. The purchase order was entered in a different year than the budget.
- D. The purchase order has NOT generated a budget yet.
Answer: A,B
NEW QUESTION 105
When do you select the percentage method for accrual calculation? There are TWO correct answers for this question
- A. When you accrue-dependent costs and an appropriate cost element for defining overhead rates is available
- B. When you accrue activity-independent costs and an appropriate cost element is NOT available
- C. When you accrue activity-independent costs and an appropriate cost element for defining overhead rates is available
- D. When you accrue activity-dependent costs and an appropriate cost element in NOT available
Answer: A,C
NEW QUESTION 106
What must the referenced cost estimate and the receiving cost estimate have in common?
- A. The company codes
- B. The quantity structure
- C. The cost component structure
- D. The plant
Answer: C
NEW QUESTION 107
In a standard system delivery, how many free characteristics can be added to an operating concern?
- A. 101-150
- B. 0-70
- C. 71-100
- D. Over 150
Answer: B
NEW QUESTION 108
For which objects can you enter statistical key figures? Note: There are 3 correct answers to this question.
- A. Internal orders
- B. Profit centers
- C. Cost elements
- D. Cost centers
- E. Functional areas
Answer: A,B,D
NEW QUESTION 109
To which object do you settle values of the result analysis ?
- A. Segment
- B. Cost center
- C. Profit Center
- D. Profitability segment
Answer: B,D
NEW QUESTION 110
In the material master record there are three planned prices: ""Planned price 1"", ""Planned price 2""and""Planned price 3"". What do you use them for?
- A. To valuate goods movement
- B. To update the standard price during the release of a standard cost estimate
- C. To valuate material stocks
- D. To valuate the materials in cost estimates
Answer: D
NEW QUESTION 111
What are some of the characteristics of internal order planning? 2 answers
- A. Costs are entered
- B. Multiple versions are allowed
- C. Tolerance limits are defined
- D. Availability control is checked
Answer: A,B
NEW QUESTION 112
You want to settle primary cost elements and secondary cost elements to different receivers. What do you use?
- A. Allocation structure
- B. PA transfer structure
- C. Overhead structure
- D. Source structure
Answer: D
NEW QUESTION 113
Which of the following statements best describe Product Cost by Period? 2 Answers
- A. It is used when the focus of controlling is on a stable continuous production process
- B. It is used joint production with process orders
- C. It is used to analyse work in a process based on actual costs
- D. It is used in conjunction with a product cost collector
Answer: A,D
NEW QUESTION 114
......